Closed Repair Requests: February 2004

See Also: All Closed Repair Requests at Ballou Senior High School

February 2004 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 73 Days
  • Routine Requests
    14
    Average Time Elapsed: 80 Days
  • Total Requests
    17

Detailed Reports

Urgent Repair Requests Completed in February 2004 (3)
Description Open Date Close Date Time Elapsed
FM-200443705 04 2/9/04 Ballou First Floor - Security Door 1) Replace door in office. Need lock. Asbestos Code A - Clear for repairs on 02/05/04. DCPS Safety - Charles Buchanan (RG 02/05/04) February 5, 2004 February 9, 2004 4 days
FM-200338851 /03 2/23/04 Ballou - Convention Center Classrooms-! thru 30 1) Provide 60 chalk boards to temporary Classrooms and Main Office. Asbestos Code A - Cleared for repairs on 10-14-03 by Leroy Minton Jr (LM/10-14-03) Safety Offiice 202-576-8962. October 14, 2003 February 23, 2004 132 days
FM-200341085 03 2/25/04 (Ballou) !!!VERY URGENT!!! 1st Floor/North Entrance: Student broke wire mesh glass on side of door. December 4, 2003 February 25, 2004 83 days

Routine Repair Requests Completed in February 2004 (14)
Description Open Date Close Date Time Elapsed
FM-200443642 04 2/4/04 (Ballou) !!!EMERGENCY!!! 1st Floor/Entrance too #115: When key is inserted, Cylinder continues too turn in lock, unable too secure door. Maintenance Entrance Door: Cylinder missing, please replace. February 3, 2004 February 4, 2004 1 day
FM-200442215 04 2/5/04 Ballou Sink leaking in childcare center. January 5, 2004 February 5, 2004 31 days
FM-200443677 04 2/6/04 Douglass Install 8" faucet on lavatory sink. February 4, 2004 February 6, 2004 2 days
FM-200340020 03 2/23/04 Ballou Furnish and install electrical outlets for ( 50 ) computers that will be housed in rooms 124 a and 124 b. Electricians will be running the electrical panel box located in the Librarian office through rooms 124 a and 124 b. All conduit will be surfaced mounted. Asbestos Code A - Clear for repairs on 11/04/03. Horne Engineering - Edward Rodriguez (RG 11/06/03) November 6, 2003 February 23, 2004 109 days
FM-200226443 03 2/23/04 BALLOU AUTOMOTIVE SHOP 1. REMOVE EXITING FIRE RATED DOOR TOOL ROOM DOOR / FROM THE PHELPS SHS TECH SHOP . INSTALL THIS DOOR AT AUTO TECH TOOL ROOM LOCATED AT BALLOU SHS. March 3, 2003 February 23, 2004 357 days
FM-200444285 04 2/23/04 (Ballou) 1st Floor/Room #117: Key will not turn latch, teacher is locked out of room. February 20, 2004 February 23, 2004 3 days
FM-200444369 04 2/24/04 (Ballou) Replace sink on right side of cafeteria. Replace, remove and add filter. Shut off unit immediately. Asbestos Code A - Clear for repairs on 02/23/04. Horne Engineering - Roger Kager (RG 02/24/04) February 23, 2004 February 24, 2004 1 day
FM-200443263 04 2/24/04 (Ballou) HEALTH CODE VIOLATION: Kitchen: Grease trap is obstructed, causing water to back up on floor areas, Repair, and clean line. January 27, 2004 February 24, 2004 28 days
FM-200338010 03 2/25/04 Ballou School Marking of football field for football game September 24, 2003 February 25, 2004 154 days
FM-200443651 04 2/25/04 Ballou Sr. High School. Raise ceramic tile by center drain in kitchen February 3, 2004 February 25, 2004 22 days
FM-200339297 /03 2/25/04 Ballou / Convention center First floor mens bathroom Two (2) sinks are stopped up plumbers are needed to unclog the drains. October 22, 2003 February 25, 2004 126 days
FM-200339853 03 2/25/04 (Ballou) Kitchen Area: Install garbage disposal in kitchen area also, install electrical out-let for disposal. November 3, 2003 February 25, 2004 114 days
FM-200339044 /03 2/25/04 (Ballou/Covention Center) Room #129: Door will not properly secure, need lock repaired or replace. Response from the carpentry shop. October 16, 2003 February 25, 2004 132 days
FM-200442907 04 2/27/04 Ballou Automotive Shop Repair or replace air copressor. Note: Air compressor leaking oil. Information:Gaylor Beall Model #730-60 Serial #5A-130TK Max. RPM 540 PIS- 175 January 18, 2004 February 27, 2004 40 days