Closed Repair Requests: February 2007

See Also: All Closed Repair Requests at Ballou Senior High School

February 2007 Summary

  • Urgent Requests
    5
    Average Time Elapsed: 1,046.8 Days
  • Routine Requests
    37
    Average Time Elapsed: 672.9 Days
  • Total Requests
    42

Detailed Reports

Urgent Repair Requests Completed in February 2007 (5)
Description Open Date Close Date Time Elapsed
FM-200620529 06 2/5/07 repair:tack weld window guard of A204 to deny access-urgent. March 29, 2006 February 5, 2007 313 days
FM-200209725 02 2/7/07 Ballou ****Urgent**** Room 122 [Art Room] Install a new circuit breaker to support the a/c in room 122. Existing breaker over tripping from overloading---need separate breaker for the a/c. June 18, 2002 February 7, 2007 1,695 days
FM-200501550 05 2/7/07 Ballou Install 120 volt quad outlet near security console unit to be installed in main entrance lobby. Code A - clear for repairs as of 3/10/05 Sylvia Grimes safety office. February 11, 2005 February 7, 2007 726 days
FM-200209722 02 2/7/07 Ballou 1. Asbestos Assessment Reqd. Parenting Center Service & convert the existing 220 electric line to a 120 electric line for the a/c unit in the parenting center for youths. Asbestos Code A - Clear for repairs on 06/18/02. DCPS Safety - Leroy Minton Jr. (RG 06/19/02) June 18, 2002 February 7, 2007 1,695 days
FM-200459482 /04 2/23/07 Ballou Emergency North entrance door Can not lock, replace panic bar. Asbestos Code A - Clear for repairs on 12/10/04. DCPS Safety - Richard Gibson (RG) December 10, 2004 February 23, 2007 805 days

Routine Repair Requests Completed in February 2007 (37)
Description Open Date Close Date Time Elapsed
FM-200503672 05 2/2/07 (Ballou) Remove toilets and unstop 4" waste line in kitchen. April 7, 2005 February 2, 2007 666 days
FM-200633996 1/07 2/5/07 Survey: r/r door to room #308 unable to secure do to vandalism. January 11, 2007 February 5, 2007 25 days
FM-200512904 05 2/7/07 (Ballou) First floor, Room 121-E. Need electricians to do survey in room 121-E for additional wall out-let for computers used by students August 5, 2005 February 7, 2007 551 days
FM-200629823 06 2/7/07 Asbestos Assessment Required 1st & 2nd Floors- Replace lights in 5 stairwells. Note: Floor plans are in the Service Center. Asbestos Code A - Clear for repairs on 09/25/06. Tidewater - Thomas Johnson (RG 09/26/06) September 21, 2006 February 7, 2007 139 days
FM-200458308 /04 2/7/07 (Ballou) Asbestos Assessment Required. Change the electrical outlets to match the plugs for the kitchen equipment the Food Service Room A35 November 12, 2004 February 7, 2007 817 days
FM-200629729 06 2/7/07 Service:relocate electrical lines in auto shop for newly purchase equipement for students. September 13, 2006 February 7, 2007 147 days
FM-200632713 30/06 2/7/07 Kitchen Area. Provide shield for lights in dry storage rooms. Four light fixtures located in two storage rooms are missing covers. Each fixture contains 4 fluorescent tubes 4 foot long. November 30, 2006 February 7, 2007 69 days
FM-200621713 06 2/7/07 Replace exit sings at gym entrance,3rd.floor north near room #300,childcare, April 24, 2006 February 7, 2007 289 days
FM-200621567 06 2/7/07 Survey:room A-119 for power poles and for computers to eliminate a fire code violation. April 20, 2006 February 7, 2007 293 days
FM-200621431 06 2/7/07 Outside- 2nd Street Side (night school entrance) A wire is hanging and it was smoking, swinging, and sparking. The fire department just left and all power is disconnected. They need someone to come out and disconnect the wire, so that they can have power everywhere else. April 18, 2006 February 7, 2007 295 days
FM-200336911 03 2/7/07 Ballou Stay Sub basement A-5 Three (3) electrical power poles are needed for the computers. How possible is it for this to be completed within the week. ASAP Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering - Philp Connolly (RG 09/09/03) September 5, 2003 February 7, 2007 1,251 days
FM-200220170 /02 2/7/07 (Ballou) replace light covers in ceiling. October 22, 2002 February 7, 2007 1,569 days
FM-200226082 03 2/7/07 Ballou First floor gym Replace bad breaker - one whole row of lights are out. February 24, 2003 February 7, 2007 1,444 days
FM-200218639 02 2/7/07 (Ballou) First floor - Gym One row of lights are working (not bulbs). October 1, 2002 February 7, 2007 1,590 days
FM-200217239 02 2/7/07 Ballou Ground - Cometology classroom Two electrical outlets needed for classroom. Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Sheryll James (RG 09/12/02 September 11, 2002 February 7, 2007 1,610 days
FM-200215416 02 2/7/07 Ballou 1. Asbestos Assessment Reqd. 1st Floor Registrar's & Asst. Principal's Office 2. Install a/c units in these two areas. Asbestos Code A-clear for repair 8/23/02 DCPS Charles E. Buchanan August 23, 2002 February 7, 2007 1,629 days
FM-200503073 05 2/7/07 (Ballou) Asbestos Assessment Required. Armory. Furnish and install light ballasts in armory 120@277 are nd.for class. Code A-clear for repair by DCPS Asbestos Code Inspector Charles Buchanan on 6/24/05 March 13, 2005 February 7, 2007 696 days
FM-200617504 06 2/7/07 Survey: r/r emergency exit lights for security purpose new tubes/bulbs were installed but no lights still. January 12, 2006 February 7, 2007 391 days
FM-200500792 05 2/7/07 Ballou Library Need electrical outlets check because the electricity keep blowing the computers out. January 25, 2005 February 7, 2007 743 days
FM-200452182 04 2/12/07 Ballou Boiler room Repair refractory on the tube sheet door of #3 boiler. August 11, 2004 February 12, 2007 915 days
FM-200633451 20/06 2/12/07 Southwest Tunnel - Busted Pipe ( 3/4 inch supply line ). December 20, 2006 February 12, 2007 54 days
FM-200629894 06 2/12/07 Ballou Boiler Room Boiler #1 Hydro test failed due to the relief valve was not removed DC Boiler Inspector September 24, 2006 February 12, 2007 141 days
FM-200625725 06 2/12/07 BALLOU SHS boiler room Furnish engineer with two (2) 50lbs. bags of refractory Note: for interior firebox touch up on boiler # 3 Info: Superheat Crete 28 Refractory, 50lbs July 17, 2006 February 12, 2007 210 days
FM-200514361 /05 2/12/07 Ballou Band Room/Music Room Install and fabricate four (4) A/C Window trays and braces for A/C window units. Information: Band Room- 2 -each Music Room 2 each October 23, 2005 February 12, 2007 477 days
FM-200512349 05 2/12/07 Ballou Boiler Room Install nipples and valves for chemical injections on return and suction line on pumps. September 12, 2005 February 12, 2007 518 days
FM-200510936 05 2/12/07 Ballou Boiler Room Boiler #2 repair or replace leaking return valve. Per Boiler Inspector August 23, 2005 February 12, 2007 538 days
FM-200510935 05 2/12/07 Ballou Boiler Room Boiler #2 repair or replace leaking tubes Per Boiler Inspector August 23, 2005 February 12, 2007 538 days
FM-200506966 05 2/12/07 Ballou Boiler Room Boiler #1, #2 and #3 Repair refractory work on the interior of boiler. Information: Pacific Steel Hot Water Boiler June 20, 2005 February 12, 2007 602 days
FM-200506965 05 2/12/07 Ballou Boiler Room Boiler #1, #2 and #3 Repair refractory work on boiler explosion doors. Information: Pacific Steel Hot Water Boiler June 20, 2005 February 12, 2007 602 days
FM-200506964 05 2/12/07 Ballou Boiler Room Boiler #2 Replace (4) four fire-tubes. Information: Pacific Steel Hot Water Boiler June 20, 2005 February 12, 2007 602 days
FM-200502530 05 2/12/07 Ballou Boiler Room Replace one (1) 6" gate valve on the feedwater supply line to #2 Boiler. Note: Valve worn and not holding, located on Boiler #2 rear. March 10, 2005 February 12, 2007 704 days
FM-200502344 05 2/12/07 Ballou Boiler Room Replace one (1) 6" gate valve on the feedwater slipplyline to Boiler #2. Note: Valve worn and not holding, located on Boiler #2 (rear) March 8, 2005 February 12, 2007 706 days
FM-200500861 05 2/12/07 Ballou Boiler Room Asbestos assessment required on Boiler #2. Boiler #2 has crack in rear shell. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Philp Connolly (RG 07/12/05) January 27, 2005 February 12, 2007 746 days
FM-200452183 04 2/12/07 Ballou BVoiler room Reweld mud legg ,right rear of #3 boiler. August 11, 2004 February 12, 2007 915 days
FM-200203485 02 2/20/07 (Ballou) 1st floor/kitchen: Change combination lock on safe, due to possible theft. February 26, 2002 February 20, 2007 1,820 days
FM-200633759 8/07 2/22/07 Perform Preventive Maintenance on Chillers. January 8, 2007 February 22, 2007 45 days
FM-200510937 05 2/26/07 Ballou Boiler Room Boiler #2 repair or replace leaking gas valve with a broken handle. Per Boiler Inspector August 23, 2005 February 26, 2007 552 days