Closed Repair Requests: March 2003

See Also: All Closed Repair Requests at Ballou Senior High School

March 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 543 Days
  • Routine Requests
    15
    Average Time Elapsed: 508.3 Days
  • Total Requests
    16

Detailed Reports

Urgent Repair Requests Completed in March 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200120675 01 3/25/03 BALLOU 1 ST FLOOR REGESTRA ROOM REPLACE (1) ONE SAFETY RELIEF VALVE ON BOILER #1 INFO: 2" RELIEF VALVE MOD# 174A 30 LBS. ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER STEPHEN CALDWELL September 28, 2001 March 25, 2003 543 days

Routine Repair Requests Completed in March 2003 (15)
Description Open Date Close Date Time Elapsed
FM-200218628 02 3/19/03 Ballou Ground floor - Locker room Re-install lumber for seats. (Three benches are broken) October 1, 2002 March 19, 2003 169 days
FM-200219128 02 3/19/03 Ballou Outside - Football field Weeds growing in bleachers need to be removed. Grass areas on the sides of the bleachers and along the fence line A. October 9, 2002 March 19, 2003 161 days
FM-200114434 01 3/19/03 BALLOU OUTSIDE - SOUTHWEST - END OF BUILDING HANDICAPP RAMP IS NEEDED AT THE SOUTHWEST END OF THE BUILDING. THIS IS IN COMPLIANCE WITH ADA CODE. June 29, 2001 March 19, 2003 628 days
FM-200100461 01 3/19/03 BALLOU BOYS SHOWER ROOM HOLES IN BOYS SHOWER GR-20000150 January 9, 2001 March 19, 2003 799 days
FM-200100075 01 3/19/03 BALLOU AROUND ENTIRE BUILDING PRUNE TREES AROUND ENTIRE BUILDING NOTE: EXISTING TREES ARE TEARING--TREE LEAVES ARE STOPPING UP ROOF DRAINS FORMERLY GR-20000032 January 6, 2001 March 19, 2003 802 days
FM-200124098 /01 3/20/03 BALLOU BOILER MAINTENANCE 1) BOILER WATER TREATMENT SERVICES TRICON OF WASHINGTON INC. POC: THOMAS PICKETT - 698-1750 November 30, 2001 March 20, 2003 475 days
FM-200121008 01 3/25/03 BALLOU BOILER ROOM REPLACE (1) ONE HOT WATER CIRCULATING PUMP THAT SUPPLIES THE HEATING TO AUTO SHOP. INFO: WORTHINGTON PUMP: SER#AZ10869 IMP. DIA. 6 3/4 A PUMP-1 1/2 LLR7 NOTE: REPLACEMENT NEEDED - WEAR AND TEAR. October 4, 2001 March 25, 2003 537 days
FM-200121007 01 3/25/03 BALLOU BOILER ROOM SPOT WELD (2) TWO 5 INCH METAL PLATES ON THE SUPPLY AND RETURN CONDENSER A/C LINES. NOTE: NO INSTALLATION ON ALL THE PIPING, PLATES ARE NEEDED TO COVER EXITING HOLES. CODE A- CLEAR FOR REPAIRS AS OF 10/24/01 (SG) FOR CEB. October 4, 2001 March 25, 2003 537 days
FM-200125642 /01 3/25/03 BALLOU BOILER ROOM REPLACE #1 HOT WATER (MAIN) CIRCULATING PUMP. INFO: BELL & GOSSETT SIZE 185011, SERIAL # 1664615 I.D. #L19. NOTE: THIS PUMP SUPPLIES HEAT TO THE MAIN BUILDING (FOR HEATING ONLY). December 18, 2001 March 25, 2003 462 days
FM-200125785 /01 3/25/03 BALLOU BOILER ROOM PM A/C CHILLER. December 19, 2001 March 25, 2003 461 days
FM-200124425 01 3/25/03 BALLOU BOILER ROOM REPLACE COOLING TOWER. TOWER IS DETERIORATED AND LEAKS BADLY. December 4, 2001 March 25, 2003 476 days
FM-200115291 01 3/25/03 BALLOU BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. BOILER #4 CLEAVER BROOKS PACKAGED: TUPE REPLACEMENT. REPLACE ENTIRE INTERIOR FIRE TUBES ON #4 BOILER (79 FIRE TUBES) BOILER INFO: CLEAVER BROOKS MOD. #760-125A, SER. #L47171. ASBESTOS CODE A - CLEAR FOR REPAIR ON 07/20/01. July 16, 2001 March 25, 2003 617 days
FM-200100842 01 3/25/03 BALLOU ROOF TOP REPAIR OR REPLACE ROOF TOP EXHAUST FAN. MOD. UNCLOSED MOTOR, 1-1/2 HP, FRAM 184, TYPE H, VOLTS 208/440, SERIAL NO. 1015-00-263, RPM 1500-1800. HC-20000259 January 11, 2001 March 25, 2003 803 days
FM-200210463 02 3/26/03 Ballou Boiler Room Replacing condenser line on cooling system. June 27, 2002 March 26, 2003 272 days
FM-200201815 02 3/26/03 BALLOU BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. RE-INSULATE AND RESET FIRE DOORS ON BOILER S #1, #2 & #3. INFO: BOILERS HOT WATER PACIFIC STEEL. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/29/02 BY HORNE ENGINEER: EDWARD RODRIGUEZ January 25, 2002 March 26, 2003 425 days