Closed Repair Requests: March 2005

See Also: All Closed Repair Requests at Ballou Senior High School

March 2005 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 366 Days
  • Routine Requests
    4
    Average Time Elapsed: 58 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in March 2005 (1)
Description Open Date Close Date Time Elapsed
FM-200445476 04 3/18/05 Ballou Urgent !! First Floor - South End - Room 115 1) Repair breech in ceiling, ceiling tile has fallen and you can see outside. Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Sheryll James (RG 03/25/04) March 17, 2004 March 18, 2005 366 days

Routine Repair Requests Completed in March 2005 (4)
Description Open Date Close Date Time Elapsed
FM-200502279 05 3/7/05 Ballou Second floo to the first floo Pipe is leaking from the second to the first floor. March 7, 2005 March 7, 2005 0 days
FM-200455901 04 3/16/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/Room #122: Missing ceiling tile. HA 032 Ceiling Tile 1' X 1' with gouge and Pinholes NAD Code A-clear for repair by DCPS Charles Buchanan on 10/14/04 September 28, 2004 March 16, 2005 169 days
FM-200502751 05 3/23/05 Ballou Rm 208 Secure Door March 15, 2005 March 23, 2005 8 days
FM-200501058 05 3/28/05 Ballou B-39 and B- 41 1) Fabricate and install metal window guards for these two classrooms. Also paint window guards. February 1, 2005 March 28, 2005 55 days