Closed Repair Requests: March 2005
See Also: All Closed Repair Requests at Ballou Senior High School
March 2005 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200445476 04 3/18/05 Ballou Urgent !! First Floor - South End - Room 115 1) Repair breech in ceiling, ceiling tile has fallen and you can see outside. Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Sheryll James (RG 03/25/04) |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200502279 05 3/7/05 Ballou Second floo to the first floo Pipe is leaking from the second to the first floor. | |||
| FM-200455901 04 3/16/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/Room #122: Missing ceiling tile. HA 032 Ceiling Tile 1' X 1' with gouge and Pinholes NAD Code A-clear for repair by DCPS Charles Buchanan on 10/14/04 | |||
| FM-200502751 05 3/23/05 Ballou Rm 208 Secure Door | |||
| FM-200501058 05 3/28/05 Ballou B-39 and B- 41 1) Fabricate and install metal window guards for these two classrooms. Also paint window guards. |