Closed Repair Requests: April 2002

See Also: All Closed Repair Requests at Ballou Senior High School

April 2002 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 26.7 Days
  • Routine Requests
    9
    Average Time Elapsed: 38.6 Days
  • Total Requests
    12

Detailed Reports

Urgent Repair Requests Completed in April 2002 (3)
Description Open Date Close Date Time Elapsed
FM-200204236 02 4/4/02 (Ballou) 1. Asbestos assessment required. 1st Floor/Main office: Install old combination locks on newly installed doors. Asbestos Code A - Clear For Repairs On 03/11/02. DCPS - Safety Richard Gibsin (202)576-5584 (RG 03/11/02) March 11, 2002 April 4, 2002 24 days
FM-200205396 02 4/12/02 Ballou Asbestos Assessment Reqd. 1st Floor Bank Install wire-mesh glass in lite kit of new metal door. Asbestos Code A - Clear For Repairs On 04/04/02. DCPS Safety - Richard Gibson(RG 04/04/02) April 3, 2002 April 12, 2002 9 days
FM-200204396 02 4/30/02 (Ballou) ****Urgent**** 2nd Floor Landing Restore lights which are out on the second floor landing leading to the main corridor [lights in corridor are also out]. March 14, 2002 April 30, 2002 47 days

Routine Repair Requests Completed in April 2002 (9)
Description Open Date Close Date Time Elapsed
FM-200202881 02 4/3/02 (BALLOU) 1ST FLOOR/ RE-KEY TWO DOORS RE-KEY LOCKS ON (2) TWO ENTRANCE DOORS TO THE MAIN OFFICE. February 12, 2002 April 3, 2002 50 days
FM-200205532 02 4/9/02 Ballou Marking of baseball field April 8, 2002 April 9, 2002 1 day
FM-200204899 02 4/11/02 (Ballou) **Emergency 1st floor: Students busted the base of the door; unable to secure for the afternoon. Hinges completely gone. This is a wood door leading to the bank. Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 3/25/02 (CEB) March 25, 2002 April 11, 2002 17 days
FM-200115390 01 4/18/02 BALLOU BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE TWO (2) 8" CHECK VALVES ON THE CHILL WATER LINES THAT CONNECT TO TWO (2) CHILL WATER CIRCULATING PUMPS. NOTE: CHECK VALVES ARE NEEDED FOR HEATING AND COOLING PURPOSE. CODE A - CLEAR FOR REPAIR AS OF 7/25/01 (SG). July 19, 2001 April 18, 2002 273 days
FM-200206053 02 4/20/02 Ballou Sr. High School Marking of baseball field for game at 3;15 April 16th April 18, 2002 April 20, 2002 2 days
FM-200206061 02 4/20/02 Ballou Sr. High School/Anacostia School Marking of baseball field for game at 4:00 April 16th April 18, 2002 April 20, 2002 2 days
FM-200206105 02 4/21/02 Ballou Sr. High/Ft. Greble Marking of baseball field for game April17th April 19, 2002 April 21, 2002 2 days
FM-200206350 02 4/23/02 Ballou School Marking of baseball field for game at 4:00 April 23rd April 23, 2002 April 23, 2002 0 days
FM-200206678 02 4/26/02 Ballou School Marking of baseball filed for game at 3:15 April 26th April 26, 2002 April 26, 2002 0 days