Closed Repair Requests: April 2005

See Also: All Closed Repair Requests at Ballou Senior High School

April 2005 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 8 Days
  • Routine Requests
    6
    Average Time Elapsed: 39.5 Days
  • Total Requests
    8

Detailed Reports

Urgent Repair Requests Completed in April 2005 (2)
Description Open Date Close Date Time Elapsed
FM-200503748 05 4/12/05 (Ballou) !!!VERY URGENT!!! Ground Floor/Armory: Domestic cold water line leaking, flooding the floor. April 8, 2005 April 12, 2005 4 days
FM-200503469 05 4/12/05 (Ballou) "Urgent" Replace or Repair lever handle on restroom in health suite. Note: Unable to secure door. March 31, 2005 April 12, 2005 12 days

Routine Repair Requests Completed in April 2005 (6)
Description Open Date Close Date Time Elapsed
FM-200455955 04 4/4/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/ROTC Room: Ceiling tile missing. HA 005 Ceiling Tile White 2X4 with Gouges and Pinholes Code A-clear for repair by DCPS Charles Buchanan on 10/14/04 September 28, 2004 April 4, 2005 188 days
FM-200502962 05 4/5/05 (Ballou) "Emergency" Third floor/Room 309. Replace busted door to computer lab, they are unable to secure the classroom. Note: The door is a solid wood door. March 18, 2005 April 5, 2005 18 days
FM-200503805 05 4/11/05 (Ballou) "Emergency" South doors. Repair and reinstall eletrical conduit, a student pulled it down from the overhang. Note: 240 Watts. of power is exposed. April 11, 2005 April 11, 2005 0 days
FM-200503410 05 4/11/05 ( Ballou ) First Floor - Room 116, Storage Room 1) Repair or Replace lock on door. March 30, 2005 April 11, 2005 12 days
FM-200503891 05 4/14/05 (Ballou) Kitchen: Unstop 4 inch waste line in kitchen. April 12, 2005 April 14, 2005 2 days
FM-200503475 05 4/18/05 Ballou Boiler Room Refractory work needed on entire interior of Boiler #1 including burner hub. Info: Pacfic Steel Hot Water Boiler April 1, 2005 April 18, 2005 17 days