Closed Repair Requests: May 2002

See Also: All Closed Repair Requests at Ballou Senior High School

May 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 3 Days
  • Routine Requests
    4
    Average Time Elapsed: 100 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in May 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200207301 02 5/10/02 (Ballou) !!!!Very Urgent!!!! Basement Level/Girls locker room: Student threw object in window of office door with wire mesh glass. Asbestos Code A - Clear for repairs on 05/07/02. Horne Engineering - Stephim Caldwell (RG 05/08/02) May 7, 2002 May 10, 2002 3 days

Routine Repair Requests Completed in May 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200117604 01 5/3/02 BALLOU FOOTBALL STADIUM ASBESTOS ASSESSMENT REQUIRED REMOVE SPIKES IN FACADE NEAR TOILET, PATCH HOLES AND PAINT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/01/01. HORNE ENGINEERING - ROGER KAGER (RG) August 16, 2001 May 3, 2002 260 days
FM-200201064 02 5/7/02 (BALLOU) ASBESTOS ASSESSMENT REQUIRED HALLWAY ADJACENT TO ROOM 353 REMOVE 300 SF OF FLOOR TILE/MASTIC DAMAGED. ASSESSMENT COMPLETED 1/14/02 P. CONNOLLY HORNE TRACKING #10941 ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/15/02 BY HORNE ENGINEER: PHILP CONNOLLY January 15, 2002 May 7, 2002 112 days
FM-200207562 02 5/24/02 Ballou 1st Floor Cafeteria Replace four [4] sections of broken window in the cafeteria. May 10, 2002 May 24, 2002 14 days
FM-200207549 02 5/24/02 (Ballou) 1. Asbestos assessment required. Northeast side/1st Floor cafeteria: Replace wire mesh glass in two (2) sets of double doors to the cafeteria. Code A-clear for repair by Horne Engineer ( Sharon Voss ) on 5/16/02 May 10, 2002 May 24, 2002 14 days