Closed Repair Requests: May 2003

See Also: All Closed Repair Requests at Ballou Senior High School

May 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 336 Days
  • Routine Requests
    4
    Average Time Elapsed: 11.8 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in May 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200210593 02 5/30/03 Ballou ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Room 121B 2. Reanchor door-frame to wall at room 121B. Code A-clear for repair by Leroy Minton of DCPS Safety on 07/01/02 DCPS CE Buchanan June 28, 2002 May 30, 2003 336 days

Routine Repair Requests Completed in May 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200329577 03 5/5/03 Ballou School Cut field with big tractor May 5, 2003 May 5, 2003 0 days
FM-200330301 03 5/19/03 Ballou Boiler Room Replace (1) one Honeywell Programeron #2 Boiler. Information: Honeywell Microcomputer Burner control system BC 7000L1000 120V 60HZ. May 19, 2003 May 19, 2003 0 days
FM-200228259 03 5/19/03 (Ballou) Kitchen area: Replace two (2) ballast in kitchen/Two (2) tube fixtures. April 3, 2003 May 19, 2003 46 days
FM-200330591 03 5/23/03 Ballou SHS Auto Shop Sub Level !!Emergency!! Extract water from well due to rain. Causing auto shop to flood May 22, 2003 May 23, 2003 1 day