May 2005 Summary

  • Urgent Requests
    7
    Average Time Elapsed: 196.1 Days
  • Routine Requests
    12
    Average Time Elapsed: 237.9 Days
  • Total Requests
    19

Detailed Reports

Urgent Repair Requests Completed in May 2005 (7)
Description Open Date Close Date Time Elapsed
FM-200505204 05 5/10/05 (Ballou) !!!VERY URGENT!!! 1st Floor/Near Cafeteria: After leaving the school bank, and on return, key will not open door. (Vault is still open) May 6, 2005 May 10, 2005 4 days
FM-200457839 04 5/23/05 (Ballou) HEALTH CODE VIOLATION: Kitchen: Repair screening at the rear door; keep doors closed at all times. Asbestos Code A - Clear for repairs on 11/03/04. DCPS Safety - Richard Gibson (RG) November 2, 2004 May 23, 2005 202 days
FM-200455023 04 5/23/05 (Ballou) !!!URGENT!!! Restrooms/Through-Out: Paint, and plaster. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Leroy Minton Jr. (RG 09/22/04) September 17, 2004 May 23, 2005 248 days
FM-200449558 04 5/23/05 R/R glass for egress areas as follow-doors in front o/auditorium,steps near elevator and room #115. Asbestos Code A - Clear for repairs on 07/08/04. DCPS Safety - Leroy Minton Jr. (RG 07/20/04) June 15, 2004 May 23, 2005 342 days
FM-200447532 04 5/23/05 (Ballou) !!!URGENT!!! Auditorium: Repair stage lights in preparations for graduation. May 5, 2004 May 23, 2005 383 days
FM-200458233 /04 5/23/05 (Ballou) !!!VERY URGENT!!! Please check non-operating power receptacles in floor of room A42 (outlets for computers) NLT 11/12/04 November 10, 2004 May 23, 2005 194 days
FM-200506131 05 5/31/05 (Ballou) "Emergency" Across from room A19/A wing section. Repair or Replace Metal electrical conduit to motion detector because it was pulled down by students. Currently the wires are exposed forming a safety hazard May 31, 2005 May 31, 2005 0 days

Routine Repair Requests Completed in May 2005 (12)
Description Open Date Close Date Time Elapsed
FM-200505023 05 5/4/05 (Ballou) Dispatch electrican to check outlets,their is on power for computers which were working in room A126. April 29, 2005 May 4, 2005 5 days
FM-200503971 05 5/9/05 Ballou Cooling Tower Furnish 1" regulator feed water assembly with attaching 5" float ball. April 13, 2005 May 9, 2005 26 days
FM-200505281 05 5/9/05 Ballou Registrars Office Repair Flooding May 9, 2005 May 9, 2005 0 days
FM-200505346 05 5/11/05 Ballou Kitchen 1) Floor drain stopped up. May 11, 2005 May 11, 2005 0 days
FM-200443955 04 5/23/05 Ballou Kitchen 1) Install ice machine. February 11, 2004 May 23, 2005 467 days
FM-200341759 /03 5/23/05 (Ballou) Kitchen: Install ice machine, and disposal in kitchen. December 17, 2003 May 23, 2005 523 days
FM-200339905 03 5/23/05 Ballou Repair gas line in kitchen, deep fryer. November 4, 2003 May 23, 2005 566 days
FM-200459727 /04 5/23/05 Ballou Basement stairwell Window was kicked out, have no tools. December 16, 2004 May 23, 2005 158 days
FM-200458428 /04 5/23/05 (Ballou) 1st, 2nd, & 3rd Floor Library, Room #115, 207, &304 Survey, and replace glass broken by accident while opening, also, fire doors on center stairwell, and fire doors by A-110. Code A-clear for repair by DCPS Charles Buchanan on 11/29/04 November 17, 2004 May 23, 2005 187 days
FM-200458088 04 5/23/05 (Ballou) HEALTH CODE VIOLATION: Kitchen: Repair or replace leaking condensation line at the dry goods area, above the food products (oils) storage shelf. Repair leaking water supply line at ice maker. November 9, 2004 May 23, 2005 195 days
FM-200452985 04 5/23/05 Ballou Janitor sinks on first floor and basement A wing There is two sinks that need to be snake out. August 19, 2004 May 23, 2005 277 days
FM-200444740 04 5/23/05 (Ballou) Asbestos Assessment Required. p.e.locker room-replace metal door to shower area,door was vandalized in the after noon by students. Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Tony Marcolin (RG 03/11/04) February 27, 2004 May 23, 2005 451 days