May 2006 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 772 Days
  • Routine Requests
    7
    Average Time Elapsed: 417.7 Days
  • Total Requests
    9

Detailed Reports

Urgent Repair Requests Completed in May 2006 (2)
Description Open Date Close Date Time Elapsed
FM-200446504 04 5/19/06 (Ballou) Asbestos Assessment Required. north end of bldg-plaster ceilling and wall in girls rest room on 1st.floor near #120(water damage) Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) April 7, 2004 May 19, 2006 772 days
FM-200446505 04 5/19/06 (Ballou) Asbestos Assessment Required. north end of bldg-plaster ceilling nad wall in girls rest room on 1st.floor near #120(water damage) Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) April 7, 2004 May 19, 2006 772 days

Routine Repair Requests Completed in May 2006 (7)
Description Open Date Close Date Time Elapsed
FM-200512184 05 5/15/06 Ballou Boiler Room Boiler #1Replace eight (8) leaking fire-tubes. Information: Pacific Hot Water Boiler. September 9, 2005 May 15, 2006 248 days
FM-200513331 05 5/15/06 Ballou Boiler Room Boiler #1(8 leaking tubes) Per DC Boiler Inspector October 1, 2005 May 15, 2006 226 days
FM-200446287 04 5/19/06 Ballou Kitchen 1) Paint Kitchen ceiling white. Lead & Asbestos Code A - Clear for repairs on 07/31/0. Horne Engineering - Edward Rodriguez (RG 04/02/04) April 2, 2004 May 19, 2006 777 days
FM-200501804 05 5/19/06 Ballou - A ( High School Bathroom Survey Report ) First Floor - North Wing Girls - Paint Wall and Ceiling HA 016 Plaster White skim coat No Asbestos HA 716 Brown Coat No Asbestos Code A-clear for repair by Charles Buchanan on 3/3/05 February 20, 2005 May 19, 2006 453 days
FM-200444431 04 5/24/06 Ballou First Floor - Main Office 1) Change existing locks on file cabinets. February 25, 2004 May 24, 2006 819 days
FM-200504744 05 5/24/06 Ballou Boiler Room Replace (2) two outdated Honeywell BC 7000L Boiler Programmer with upgrade version fireye EB 700 Boiler programmer. For #2 and #3 Boilers. April 26, 2005 May 24, 2006 393 days
FM-200622691 06 5/24/06 Ballou Room #105 - Science Lab Repair or replace two univent motors and capacitor. Information: GE 5KCP39PGS824S HP 1/4 Volt 115 Amps 3.10 RMP 1075 PH 1 HZ 60 Frame 48 Capacitor GE 27L5019 Vac 370 HZ 50/60 24A100330AB-18 May 16, 2006 May 24, 2006 8 days