Closed Repair Requests: June 2002

See Also: All Closed Repair Requests at Ballou Senior High School

June 2002 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    6
    Average Time Elapsed: 87.5 Days
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Completed in June 2002 (6)
Description Open Date Close Date Time Elapsed
FM-200207751 02 6/3/02 Ballou 1st Floor Pre-K Room 108 There is no water in the faucet. May 15, 2002 June 3, 2002 19 days
FM-200206654 02 6/3/02 Ballou ****Emergency**** 1st Floor Male Staff Restroom The hand-basin is clogged and black sewer water is backing up into it and emitting a very bad odor. April 25, 2002 June 3, 2002 39 days
FM-200209251 02 6/10/02 Ballou Stay Sub Basement - A-wing ,lower level - South Door 1) Exterior door glass broken out. June 10, 2002 June 10, 2002 0 days
FM-200204843 02 6/24/02 Ballou 1st fl. North custodial supply room Replace busted 2" nipple *heating" supply line that connects to the AHU. NOTE: Asbestos assessment required. Code A-clear for repair by Horne Engineer ( Sam Edrahim ) on 4/01/02 (CEB) March 22, 2002 June 24, 2002 94 days
FM-200118494 01 6/26/02 BALLOU OUTSIDE - GROUNDS REMOVE GRAFFITI NEAR TOILETS CODE A-CLEAR FOR REPAIR BY HORNE ENG. RICHARD BYRD 8/30/01. August 27, 2001 June 26, 2002 303 days
FM-200206080 02 6/27/02 Ballou Boiler room Replace Trane Centravac Chiller electrical A/C contactor and coil assembly (for air conditioning). Info: Part : AC contactor - Westinghouse Mech style 2010A22G01 Max. Tl. amps 220, Max Lr amps 1320. Info: Part: Westinghouse size 43 s-1490647C 440v-60 350v-50 ct 220v-25cy April 18, 2002 June 27, 2002 70 days