Closed Repair Requests: June 2003
See Also: All Closed Repair Requests at Ballou Senior High School
June 2003 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200225379 03 6/18/03 Ballou Boiler Room Asbestos assessment required Replace 2" X 3 ft. leaking feed water supply line to the expansion tank. Note: Expansion tank has to be drained to repair pipe. Asbestos Code A, clear for repairs on 02/14/03 DCPS Safety, R Edwards (RE) Abatement was conducted 02/13/03 by CATI Re-insulation will begin after pipeline iis repaired. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200330091 03 6/2/03 Ballou North Tunnel (top side Room #103) Replace bused 3/4" heating feedwater supply line. Note: Heating water is being lost daily. | |||
| FM-200331059 03 6/5/03 Ballou School Cut grass with big tractor | |||
| FM-200331237 03 6/6/03 Ballou School Exterior Grounds Marking of field for baseball game @ Oxon Run | |||
| FM-200331280 03 6/6/03 Ballou School Exterior Grounds Marking of field for baseball game | |||
| FM-200226484 03 6/6/03 Ballou Cafeteria Service exiting outlets for power and install addition outlets. | |||
| FM-200331844 03 6/18/03 Ballou High School Exterior Grounds 1. Cut grass with big tractor | |||
| FM-200332656 03 6/30/03 "EMERGENCY" Ballou SHS Boiler Room Boiler Room Stopped up drain, backing up in boiler room *Need immediate attention* |