Closed Repair Requests: June 2003

See Also: All Closed Repair Requests at Ballou Senior High School

June 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 131 Days
  • Routine Requests
    7
    Average Time Elapsed: 17.9 Days
  • Total Requests
    8

Detailed Reports

Urgent Repair Requests Completed in June 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200225379 03 6/18/03 Ballou Boiler Room Asbestos assessment required Replace 2" X 3 ft. leaking feed water supply line to the expansion tank. Note: Expansion tank has to be drained to repair pipe. Asbestos Code A, clear for repairs on 02/14/03 DCPS Safety, R Edwards (RE) Abatement was conducted 02/13/03 by CATI Re-insulation will begin after pipeline iis repaired. February 7, 2003 June 18, 2003 131 days

Routine Repair Requests Completed in June 2003 (7)
Description Open Date Close Date Time Elapsed
FM-200330091 03 6/2/03 Ballou North Tunnel (top side Room #103) Replace bused 3/4" heating feedwater supply line. Note: Heating water is being lost daily. May 13, 2003 June 2, 2003 20 days
FM-200331059 03 6/5/03 Ballou School Cut grass with big tractor June 3, 2003 June 5, 2003 2 days
FM-200331237 03 6/6/03 Ballou School Exterior Grounds Marking of field for baseball game @ Oxon Run June 4, 2003 June 6, 2003 2 days
FM-200331280 03 6/6/03 Ballou School Exterior Grounds Marking of field for baseball game June 4, 2003 June 6, 2003 2 days
FM-200226484 03 6/6/03 Ballou Cafeteria Service exiting outlets for power and install addition outlets. March 4, 2003 June 6, 2003 94 days
FM-200331844 03 6/18/03 Ballou High School Exterior Grounds 1. Cut grass with big tractor June 16, 2003 June 18, 2003 2 days
FM-200332656 03 6/30/03 "EMERGENCY" Ballou SHS Boiler Room Boiler Room Stopped up drain, backing up in boiler room *Need immediate attention* June 27, 2003 June 30, 2003 3 days