Closed Repair Requests: June 2006

See Also: All Closed Repair Requests at Ballou Senior High School

June 2006 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 83 Days
  • Routine Requests
    5
    Average Time Elapsed: 86.6 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in June 2006 (1)
Description Open Date Close Date Time Elapsed
FM-200620454 06 6/19/06 First floor, Room 104/Teacher's Prep. Room & Room A104/Science Lab. "Urgent" Remove lever locks & install storage room function locks. Also furnish (4) pass keys & key to building's master key. March 28, 2006 June 19, 2006 83 days

Routine Repair Requests Completed in June 2006 (5)
Description Open Date Close Date Time Elapsed
FM-200623351 06 6/1/06 Basement Level, Room A-1-11. Repair or Replace lock cylider on door, also remove pieces of broken master key from out of lock. Note: This door cannot be secured. May 25, 2006 June 1, 2006 7 days
FM-200623123 06 6/2/06 3rd Fl.-Rm. 312/1st Fl. Rm. 123-Install locks on the doors, the doors were recently installed and the rooms can't be secured. May 23, 2006 June 2, 2006 10 days
FM-200505127 05 6/16/06 (Ballou) First floor, Hall. Rehung wall hung drinking fountain. May 4, 2005 June 16, 2006 408 days
FM-200624741 06 6/30/06 Ballou Boiler Room Replace leaking tubes in Boilers #2. * On June 23, 2006 Payne and Hamlin re-rolled 3 tubes. They stopped leaking. June 26, 2006 June 30, 2006 4 days
FM-200624736 06 6/30/06 Ballou Boiler Room Repair refractory work in combustion chamber to Boilers #1 and #2. June 26, 2006 June 30, 2006 4 days