Closed Repair Requests: July 2002

See Also: All Closed Repair Requests at Ballou Senior High School

July 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 8 Days
  • Routine Requests
    2
    Average Time Elapsed: 10.5 Days
  • Total Requests
    3

Detailed Reports

Urgent Repair Requests Completed in July 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200210226 02 7/3/02 Ballou ****Urgent**** 1. Asbestos Assessment Reqd. Ground-floor Level Boys' Restroom Urinal #1 will not flush and #5 is leaking from the wall. Asbestos Code A - Clear for repairs on, 6/26/02 DCPS Safety, R. Edwards (RE - 6/26/02) June 25, 2002 July 3, 2002 8 days

Routine Repair Requests Completed in July 2002 (2)
Description Open Date Close Date Time Elapsed
FM-200210088 02 7/15/02 Ballou/Stay North Stairwell The water fountain in the north stairwell dains out very slowly--- needs servicing. June 24, 2002 July 15, 2002 21 days
FM-200213300 02 7/29/02 Ballou School Cutti ng of grass with big tractor July 29, 2002 July 29, 2002 0 days