Closed Repair Requests: July 2003
See Also: All Closed Repair Requests at Ballou Senior High School
July 2003 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
5Average Time Elapsed: 32.6 Days - Total Requests
5
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200331888 03 7/10/03 Ballou Health Suite (Ceiling) Repair air condition split system. Info: Carrier-Nordyne ser. #T3B970209693 mod. #T3BAO48K. Note: Unit will not operate. | |||
| FM-200333404 03 7/22/03 Ballou Boiler Room Check A/C unit for refrigerant, low in refrigerant, need approximate. 100-Lbs. | |||
| FM-200332874 03 7/28/03 Ballou Room 204, boys and girls restroom near gym, teachers restroom and 2nd floor awing Repair doors in the above areas. | |||
| FM-200332878 03 7/29/03 Ballou Install ice machine in kitchen. Equipment is on site. | |||
| FM-200329692 03 7/29/03 (Ballou) Install locking high security screen door over existing auto shop tool room door to provide tool storage security. Asbestos Code A - Clear for repairs on 05/16/05. Horne Engineering - Troy Wilcome (05/19/03) |