Closed Repair Requests: July 2004

See Also: All Closed Repair Requests at Ballou Senior High School

July 2004 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    1
    Average Time Elapsed: 158 Days
  • Total Requests
    1

Detailed Reports

Routine Repair Requests Completed in July 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200443411 04 7/6/04 Ballou Boiler Room Boiler #3 Repair leaking right rear water leg. Information: Boiler #3 Pacific Steel Hot Water #122037 January 30, 2004 July 6, 2004 158 days

© The Washington Post Company