| FM-200107175 01 7/27/05 BALLOU FIRST (1ST) FLOOR - CLASSROOMS 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE LIGHT BALLASTS THROUGH OUT BUILDING. SAFETY HAZARD. ASBESTOS COBE A - CLEAR REPAIRS | |||
| FM-200107176 01 7/27/05 BALLOU FIRST (1ST) FLOOR - HALLWAY 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE ERISTINS ELECTRICAL PANEL. BREAKER AND BUS WITH NEW. 1 - 277/480V PANEL 1 - 120/208V PANEL SAFETY HAZARD. Asbestos Code A - Clear for Repair |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200455958 04 7/11/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/Through-Out Hallways: Ceiling tile missing. HA 032 Ceiling Tile 1' X 1' with gouge and Pinholes NAD Code A-clear for repair by DCPS Charles Buchanan on 10/14/04 | |||
| FM-200501336 05 7/12/05 (Ballou) please sandblast/power-wash writing on north-west wall of small lot-see Atkinson. | |||
| FM-200505020 05 7/13/05 (Ballou) locksmith nd.for restroom 2nd floor of a-wing students denied access. | |||
| FM-200101357 01 7/22/05 BALLOU AUDITORIUM PAINT RENOVATION ASBESTOS ASSESSMENT REQUIRED MT-20001788 ORIGINAL REQUEST DATE 01-16-01(FJ) | |||
| FM-200508374 05 7/22/05 Ballou Hallway Panel Box Replace (2) two bad general electric 20 amp circuit breakers for operation of A/C window units in rooms #309 and #315. | |||
| FM-200508335 05 7/22/05 Ballou High School Repair 100 feet of fence on stadium | |||
| FM-200108002 01 7/22/05 BALLOU 1) INSTALL LIGHTS ACCORDING TO SCOPE. # ELS CONTRACTING , INC. | |||
| FM-200107970 01 7/22/05 BALLOU OUTSIDE REPLACE EXTERIOR LIGHTS AROUND SCHOOL ASBESTOS CODE A-CLREAR FOR REPAIR BY CHARLES E BUCHANAN 6/28/01 | |||
| FM-200101667 01 7/22/05 BALLOU 1)MAIN OFFICE, PRINICIPAL, ASSISTANT PRINCIPALS OFFICE, ROOM A116, 126, A127, COUNSELORS OFFICE AND LIBRARY 2) ASBESTOS ASSESSMENT REQUIRED 3) REPAIR/REPLACE FLOORING MATERIAL MT-20001861 ASBESTOS CODE A-CLEAR FOR REPAIRS | |||
| FM-200101372 01 7/22/05 BALLOU AUDITORIUM AND FIRST FLOOR- A- WING ASBESTOS ASSESSMENT REPLACE LIGHT FIXTURE, PAINT FIRST MT-20001784 ABS MGR. ADDED - ORIGINAL INITIATED 1/16/01 (FJ) INSTALL FLORESCENT TUBES IN (25) LIGHT FIXTURES. 5/29/01 | |||
| FM-200508375 05 7/22/05 Ballou Room #308, #309 and #310 Check and repair breaker for the following classrooms: #308, #309 and #310. Breakers for these rooms operate A/C window units are drawing high amos causing breaker to trip. (3) Three General electric 20 amp circuit breakers | |||
| FM-200109571 01 7/25/05 (BALLOU-STAY) 1. ASBESTOS ASSESSMENT REQUIRED. SUB-BASEMENT/ALL CLASSROOMS: ELECTRICAL UPGRADE IN NEEDED ON LIGHTS. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/09/01. | |||
| FM-200105849 01 7/26/05 BALLOU FITNESS CTR. 122 REPLACE MISSING AHU MOTOR (CEILING AREA) NOTE: AHU MOTR WAS TAKEN AWAY FROM SITE 2 YRS. AGO AND NEVER REPLACED (MECH. MAINT. SHOP). | |||
| FM-200105844 01 7/26/05 BALLOU AUTO SHOP CEILING REPLACE (4) FOUR SHAFT BEARING ASSEMBLIES ON (2) TWO CEILING A.H.U. INFO: 1" SHAFT BEARINGS (4) FOUR. NOTE: MECHANICAL MAINTENANCE DIVISION HAS SAMPLE THAT WAS TAKEN AWAY AT SITE ALSO AHU IS 15 FT. IN THE CEILING AREA. |