Closed Repair Requests: August 2003

See Also: All Closed Repair Requests at Ballou Senior High School

August 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 30 Days
  • Routine Requests
    13
    Average Time Elapsed: 68.5 Days
  • Total Requests
    15

Detailed Reports

Urgent Repair Requests Completed in August 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200333594 03 8/20/03 (Ballou) FIRE CODE VIOLATION: 1st Floor: Safety glass in center stairwell #1. July 22, 2003 August 20, 2003 29 days
FM-200333592 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 1st Floor/Stairwell #2: Safety glass in Center stairwell #2. July 22, 2003 August 22, 2003 31 days

Routine Repair Requests Completed in August 2003 (13)
Description Open Date Close Date Time Elapsed
FM-200330304 03 8/8/03 Ballou Boiler Room Repair leaking rear water leg. Information: Boiler #2 Pacific Steel Hotwater Model #122040 Note: Loosing Hot-Water Daily. May 19, 2003 August 8, 2003 81 days
FM-200332875 03 8/13/03 Ballou Replace locks to the following restroom in armor, parenting cntr., datd entrance office, room 308, 206, A123 and registra office also 210 and maintenance office also door fr. mainoffice to principal area. July 3, 2003 August 13, 2003 41 days
FM-200224912 03 8/19/03 Ballou Installation of shampoo arza equipment, removal od pedicure unit and moving electrical outlet closer to Mr. Jones for there use. January 30, 2003 August 19, 2003 201 days
FM-200335693 03 8/21/03 Ballou School Cut and trim grass alon rear of school August 19, 2003 August 21, 2003 2 days
FM-200335686 03 8/21/03 Ballou School Cut and trim grass along outside of area that contractor dont cut August 19, 2003 August 21, 2003 2 days
FM-200331884 03 8/21/03 Ballou Room A-1, Principal's Office,Ballou Stay Replace deteroiated univent A/C Condensate Pan. Note: Condesate leaking on the floor., when the A/C units on. June 16, 2003 August 21, 2003 66 days
FM-200333612 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 1st Floor/Near Room #115: Exposed wiring in the ceiling. July 22, 2003 August 22, 2003 31 days
FM-200333609 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 2nd Floor/Stairwell #2: Exit light near Room #200. July 22, 2003 August 22, 2003 31 days
FM-200216054 02 8/27/03 Ballou/Stay 1. Asbestos Assessment Reqd. Install telephone power poles for office space [Verizon will be relocating phone and data cables]. Asbestos Code A - Clear for repairs on 08/29/02. Honre Engineering - Sam Ebrahim (RG 08/30/02) August 28, 2002 August 27, 2003 364 days
FM-200336464 03 8/27/03 Ballou School Marking of football field for football game for Autust 29th August 27, 2003 August 27, 2003 0 days
FM-200335211 03 8/27/03 Ballou First floor Furnish keys for principal to main office and exterior entrance doors. August 14, 2003 August 27, 2003 13 days
FM-200332877 03 8/29/03 Ballou R/R leaver handle locks to auditorium, #121. July 3, 2003 August 29, 2003 57 days
FM-200336507 03 8/30/03 Ballou School Cut and trim grass August 28, 2003 August 30, 2003 2 days