Closed Repair Requests: August 2003
See Also: All Closed Repair Requests at Ballou Senior High School
August 2003 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200333594 03 8/20/03 (Ballou) FIRE CODE VIOLATION: 1st Floor: Safety glass in center stairwell #1. | |||
| FM-200333592 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 1st Floor/Stairwell #2: Safety glass in Center stairwell #2. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200330304 03 8/8/03 Ballou Boiler Room Repair leaking rear water leg. Information: Boiler #2 Pacific Steel Hotwater Model #122040 Note: Loosing Hot-Water Daily. | |||
| FM-200332875 03 8/13/03 Ballou Replace locks to the following restroom in armor, parenting cntr., datd entrance office, room 308, 206, A123 and registra office also 210 and maintenance office also door fr. mainoffice to principal area. | |||
| FM-200224912 03 8/19/03 Ballou Installation of shampoo arza equipment, removal od pedicure unit and moving electrical outlet closer to Mr. Jones for there use. | |||
| FM-200335693 03 8/21/03 Ballou School Cut and trim grass alon rear of school | |||
| FM-200335686 03 8/21/03 Ballou School Cut and trim grass along outside of area that contractor dont cut | |||
| FM-200331884 03 8/21/03 Ballou Room A-1, Principal's Office,Ballou Stay Replace deteroiated univent A/C Condensate Pan. Note: Condesate leaking on the floor., when the A/C units on. | |||
| FM-200333612 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 1st Floor/Near Room #115: Exposed wiring in the ceiling. | |||
| FM-200333609 03 8/22/03 (Ballou) FIRE CODE VIOLATION: 2nd Floor/Stairwell #2: Exit light near Room #200. | |||
| FM-200216054 02 8/27/03 Ballou/Stay 1. Asbestos Assessment Reqd. Install telephone power poles for office space [Verizon will be relocating phone and data cables]. Asbestos Code A - Clear for repairs on 08/29/02. Honre Engineering - Sam Ebrahim (RG 08/30/02) | |||
| FM-200336464 03 8/27/03 Ballou School Marking of football field for football game for Autust 29th | |||
| FM-200335211 03 8/27/03 Ballou First floor Furnish keys for principal to main office and exterior entrance doors. | |||
| FM-200332877 03 8/29/03 Ballou R/R leaver handle locks to auditorium, #121. | |||
| FM-200336507 03 8/30/03 Ballou School Cut and trim grass |
© The Washington Post Company
