Closed Repair Requests: September 2002

See Also: All Closed Repair Requests at Ballou Senior High School

September 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 14 Days
  • Routine Requests
    6
    Average Time Elapsed: 89.2 Days
  • Total Requests
    7

Detailed Reports

Urgent Repair Requests Completed in September 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200216316 02 9/17/02 Ballou ***Urgent*** 1st Floor 7D Police Office Restroom Toilet will not flush. September 3, 2002 September 17, 2002 14 days

Routine Repair Requests Completed in September 2002 (6)
Description Open Date Close Date Time Elapsed
FM-200218179 02 9/24/02 Ballou Senior High School Marking of football field for game at 7:30 Browne vs Johnson September 24, 2002 September 24, 2002 0 days
FM-200218178 02 9/24/02 Ballou Marking of football field for game at 5:30 Jefferson vs Hine September 24, 2002 September 24, 2002 0 days
FM-200216992 02 9/26/02 Ballou F- 608.1 Fire Code Violation Armory Locker Room Electrical swith cover needed in boys' locker room. September 9, 2002 September 26, 2002 17 days
FM-200216999 02 9/26/02 Ballou F- 601.2 Fire Code Violation Cafeteria Extension cords used for permanent wiring. September 9, 2002 September 26, 2002 17 days
FM-200201274 02 9/27/02 BALLOU SUB-BASEMENT BOILER ROOM/ BOILER #1 REFACTORY THE ENTIRE INTERIOR OF THE BURNER HUB AND SURROUNDING FRONT STURCTURE TO #1 BOILER. INFO BOILER #1 PACIFIC STEEL HOT-WATER MOD. #122039. ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/23/02 HORNE ENGINEERING - EDWARD RODRIGUEZ (RG)-01/24/02 January 17, 2002 September 27, 2002 253 days
FM-200201814 02 9/30/02 BALLOU BOILER ROOM REFRACTORY WORK NEEDED ON THE ENTIRE INTERIOR OF THE BURNER HUB AND SURROUNDING FRONT STRUCTURE TO #2 BOILER. INFO: BOILER #2 HOT WATER PACIFIC STEEL. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/29/02 BY HORNE ENGINEER:EDWARD RODRIGUEZ January 25, 2002 September 30, 2002 248 days