Closed Repair Requests: September 2005

See Also: All Closed Repair Requests at Ballou Senior High School

September 2005 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 104 Days
  • Routine Requests
    15
    Average Time Elapsed: 56.6 Days
  • Total Requests
    18

Detailed Reports

Urgent Repair Requests Completed in September 2005 (3)
Description Open Date Close Date Time Elapsed
FM-200504752 05 9/9/05 (Ballou) Asbestos Assessment Required. furnish and install florescent fixtures on steps for safty the present fixtures are not working (urgent). Code A-clear for repair by DCPS Asbestos Code Inspector Charles Buchanan on 6/24/05 April 23, 2005 September 9, 2005 139 days
FM-200505414 05 9/16/05 (ballou) "Urgent" First floor, Auto Shop. Pump out flooded area in back of auto shop. May 12, 2005 September 16, 2005 127 days
FM-200512936 05 9/23/05 (Ballou) First floor, Administrative Clerk's office. Furnish and install one knob lock to administrative clerk office(urgent). August 8, 2005 September 23, 2005 46 days

Routine Repair Requests Completed in September 2005 (15)
Description Open Date Close Date Time Elapsed
FM-200510495 05 9/1/05 (Ballou/Stay High School) Sub basement level. Repair or Replace (2) urinals in Boys' restroom. August 16, 2005 September 1, 2005 16 days
FM-200510939 05 9/5/05 Ballou Re-key and cut four master keys for the following areas: Third Floor-Assistant Principal Office Bottom Floor-Assistant Principal Office Main Office-Administrator Office August 23, 2005 September 5, 2005 13 days
FM-200511664 05 9/8/05 Ballou Emergency Basement-Tec. Center-A Wing No lights in corridor August 31, 2005 September 8, 2005 8 days
FM-200448361 04 9/9/05 Ballou Drive-way by the cooling tower and boiler room door. Clean out and unstop storm drain in the drive way by the cooling tower,the drain over when it rains and is need to help keep down the spatted of West Nile decease. May 24, 2004 September 9, 2005 473 days
FM-200512190 05 9/13/05 Ballou Stay Storage Room Replace (3) three electrical outlets need to be installed in storage room September 9, 2005 September 13, 2005 4 days
FM-200500815 05 9/14/05 Ballou Science Lab A 104 Replace univent motor (Split System). Information: Herman Nelson, Model AZS,AZQ. Part #106101101, Motor Infor. GE Ser. #5KCP39PG-5824, HP 1/4 PH 1 Amp 3.10 HZ 60 RPM 1075 January 26, 2005 September 14, 2005 231 days
FM-200511815 05 9/15/05 Ballou Fire Code Violation Third Floor-Broken door lock rm. 311 September 6, 2005 September 15, 2005 9 days
FM-200511841 05 9/15/05 Ballou Fire Code Violation First Floor-Broken lock on exit door near rm. 111 September 6, 2005 September 15, 2005 9 days
FM-200511828 05 9/15/05 Ballou Fire Code Violation First Floor-Broken door lock rm. 103 September 6, 2005 September 15, 2005 9 days
FM-200511827 05 9/15/05 Ballou Fire Code Violation First Floor-Broken door lock rm. 102 September 6, 2005 September 15, 2005 9 days
FM-200511819 05 9/15/05 Ballou Fire Code Violation Third Floor-Broken door lock rm. 300 September 6, 2005 September 15, 2005 9 days
FM-200511814 05 9/15/05 Ballou Fire Code Violation Third Floor-Broken door lock rm. 314 September 6, 2005 September 15, 2005 9 days
FM-200512926 05 9/23/05 (Ballou) First floor, Room 121-E. Furnish and install knob lock to room 121-E for teacher access before opening of school(Principal reqest) August 5, 2005 September 23, 2005 49 days
FM-200513034 05 9/23/05 Ballou Emergency First Floor-Data Entry Unable to gain access to the office, the lock is not working September 22, 2005 September 23, 2005 1 day
FM-200513145 05 9/26/05 Ballou Emergency Registry-First Floor (south end of building) Floor outlets no current, checked breaker and the breaker was ok, September 26, 2005 September 26, 2005 0 days