Closed Repair Requests: September 2006
See Also: All Closed Repair Requests at Ballou Senior High School
September 2006 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200625564 06 9/11/06 Ballou Boiler Room Replace safety valve on Boiler #1 and #3 Boiler #1 fail hydro DC Boiler Inspector | |||
| FM-200218641 02 9/22/06 Ballou Ground floor - Locker room Shower not working no water (possible the mixing valve). Asbestos Code A - Cleared for repairs on 10-02-02 (LM/10-02-02) Leroy Minton Jr. Safety Office (202-) 576-8962. | |||
| FM-200205654 02 9/22/06 Ballou ****Urgent**** Main Floor Security Office Hand sink is backed up and the commode will not flush. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200625726 06 9/11/06 BALLOU SHS boiler room Re-roll 3 firetubes on the inside (firebox) # 2 boiler. Note: These new tubes were installed last year 4-28-05 W/O - FM200503749 6-20-05 (2 work orders were submitted last year) | |||
| FM-200504005 05 9/20/06 Ballou counselor's office 121E 1st floor Replace ruptured 3/4" supply line from convector to main supply line , approximately 3' feet. | |||
| FM-200510938 05 9/20/06 Ballou Boiler Room Boiler #3 repair or replace refractory work that is needed within the firebox. Per Boiler Inspector | |||
| FM-200503120 05 9/22/06 Ballou ( Ballou Stay ) 1) Install Marque at entrance of Ballou Stay. | |||
| FM-200511767 05 9/22/06 (Ballou) "Emergency" Unclog sink in Home Economics room. | |||
| FM-200220171 /02 9/22/06 (Ballou) Raise pipes under 3-compartment sink. health code violation. | |||
| FM-200503584 05 9/22/06 need k50 to snake drain in home EC.work nd.before school return fr.spring break. | |||
| FM-200628170 06 9/22/06 First floor, Kitchen. Unclog sink that's backing up. |