Urgent Closed Repair Requests
See Also: All Closed Repair Requests at Kelly Miller MS
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200455996 04 9/28/04 (Miller) !!!URGENT!!! 1st Floor/Boys Restroom: Stopped up toilet affecting the other bathrooms; when flushed, all others run over. | |||
| FM-200500414 05 2/23/05 MILLER THIRD FL GIRLS RESTROOM INSTALL SINK TO WALL Asbestos Code A - Clear for repairs on 01/14/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200500834 05 10/31/05 Miller, Kelly Third floor boys lavatory Plaster and paint walls and ceiling. Vandalism lavatory was set on fire. Asbestos Code A - Clear for repairs on 01/26/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200505012 05 10/31/05 (Miller) !!!VERY URGENT!!! 1st Floor/Girls Restroom: Sink has come completely off the wall; please re-attach sink to wall. Note: Superintendent will be visiting this school in the evening, request repairs before 5 | |||
| FM-200515901 /05 12/30/05 Repair partitions in the boys and girls restroom on the first floor near the cafeteria. Asbestos Code A - Clear for repairs on 11/30/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200507247 05 1/16/06 !!!!!VERY URGENT!!!!! Stairwell on the back side of the school There was a rock thrown through the window between second and the third floor landing the window was broken and there is a big hole in it. Note: The window has cracked and is about to fall out. | |||
| FM-200454849 04 2/6/06 Miller, Kelly Need to have slide bolts put on exterior doors throughout building. Need for door security. Asbestos Code A - Clear for repairs on 09/16/04. DCPS Safety - Leroy Minton JR. (RG 09/16/04) | |||
| FM-200516930 /05 2/6/06 Miller Check with Custodian Foreman Repair leak on main line coming into Building. Gas Company turn off gas to Building. No heat in building. Urgent !!!! | |||
| FM-200507245 05 2/6/06 !!!!!VERY URGENT!!!!!! First Floor - Outside of Room 102 Water may be dripping from a pipe up in the ceiling Code A-clear for repair by DCPS Charles Buchanan on 5/30/05 | |||
| FM-200500428 05 3/2/06 MILLER FIRST & THIRD FL. RMS 138/ 308/ 304 INSTALL HARDWARE ON DOORS Asbestos Code A - Clear for repairs on 01/14/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200457972 04 3/2/06 Miller, Kelly Gym and stairwell # 1 Need to have hole in wall repaired. Asbestos Code A - Clear for repairs on 11/05/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200619180 06 3/13/06 "Emergency" Fabricate and install four designed guards over vents for safety reasons.contractor's vents are very unsafe. Asbestos Code A - Clear for repairs on 03/01/06 Tidewater - Thomas Johnson (RG 03/01/05) | |||
| FM-200621748 06 4/27/06 First Floor-Need partition in boy's restroom repaired. (2) Asbestos Code A - Clear for repairs on 04/25/06. DCPS Safety - Richard Gibson (RG) | |||
| FM-200621752 06 4/27/06 Repair cafeteria door near gym, unable to secure. Asbestos Code A - Clear for repairs on 04/25/06. DCPS Safety - Richard Gibson (RG) | |||
| FM-200512264 05 5/15/06 Miller Boilerroom Remove Safety valves and cap off boilers # 1 and # 3 so that the engineer can perform hydro on the boilers. PER BOILER INSPECTOR'S REQUEST | |||
| FM-200627234 06 11/28/06 Third Floor/Ceiling tile missing, hallway right of elevator. Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson (RG) | |||
| FM-200627265 06 11/28/06 Second Floor/Ceiling tile missing hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) | |||
| FM-200627261 06 11/28/06 Second Floor/Ceiling tile missing 214 Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) | |||
| FM-200627247 06 11/28/06 Third Floor/Ceiling tile missing, hallway next to 305 Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson (RG) | |||
| FM-200627266 06 12/1/06 Third Floor/Bathroom partition broken and missing. Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) | |||
| FM-200627280 06 12/6/06 First Floor/Door Missing In Hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) | |||
| FM-200627271 06 12/7/06 First Floor/Missing ceiling tile in hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) | |||
| FM-200629853 06 3/1/07 Replacement of damaged or missing ceiling tile throughout the building. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. DCPS Safety - Richard Gibson (RG 09/22/06) | |||
| FM-200633022 2/8/06 3/1/07 First Floor - Girl's Bathroom Near Gym - R/R Partition, it fell down Asbestos Code A - Clear for repairs on 12/08/06. DCPS Safety - Richard Gibson (RG) | |||
| FM-200506068 05 3/1/07 (Miller) Asbestos Assessment Required. Main lobby area. Install dedication plaque in specified area. Asbestos Code A - Clear for repairs on 05/27/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200627267 06 3/29/07 Second Floor/Glass broken front stairwell Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) |