Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200455996 04 9/28/04 (Miller) !!!URGENT!!! 1st Floor/Boys Restroom: Stopped up toilet affecting the other bathrooms; when flushed, all others run over. September 28, 2004 September 28, 2004 0 days
FM-200500414 05 2/23/05 MILLER THIRD FL GIRLS RESTROOM INSTALL SINK TO WALL Asbestos Code A - Clear for repairs on 01/14/05. DCPS Safety - Richard Gibson (RG) January 13, 2005 February 23, 2005 41 days
FM-200500834 05 10/31/05 Miller, Kelly Third floor boys lavatory Plaster and paint walls and ceiling. Vandalism lavatory was set on fire. Asbestos Code A - Clear for repairs on 01/26/05. DCPS Safety - Richard Gibson (RG) January 26, 2005 October 31, 2005 278 days
FM-200505012 05 10/31/05 (Miller) !!!VERY URGENT!!! 1st Floor/Girls Restroom: Sink has come completely off the wall; please re-attach sink to wall. Note: Superintendent will be visiting this school in the evening, request repairs before 5 May 2, 2005 October 31, 2005 182 days
FM-200515901 /05 12/30/05 Repair partitions in the boys and girls restroom on the first floor near the cafeteria. Asbestos Code A - Clear for repairs on 11/30/05. DCPS Safety - Richard Gibson (RG) November 30, 2005 December 30, 2005 30 days
FM-200507247 05 1/16/06 !!!!!VERY URGENT!!!!! Stairwell on the back side of the school There was a rock thrown through the window between second and the third floor landing the window was broken and there is a big hole in it. Note: The window has cracked and is about to fall out. June 29, 2005 January 16, 2006 201 days
FM-200454849 04 2/6/06 Miller, Kelly Need to have slide bolts put on exterior doors throughout building. Need for door security. Asbestos Code A - Clear for repairs on 09/16/04. DCPS Safety - Leroy Minton JR. (RG 09/16/04) September 16, 2004 February 6, 2006 508 days
FM-200516930 /05 2/6/06 Miller Check with Custodian Foreman Repair leak on main line coming into Building. Gas Company turn off gas to Building. No heat in building. Urgent !!!! December 27, 2005 February 6, 2006 41 days
FM-200507245 05 2/6/06 !!!!!VERY URGENT!!!!!! First Floor - Outside of Room 102 Water may be dripping from a pipe up in the ceiling Code A-clear for repair by DCPS Charles Buchanan on 5/30/05 June 28, 2005 February 6, 2006 223 days
FM-200500428 05 3/2/06 MILLER FIRST & THIRD FL. RMS 138/ 308/ 304 INSTALL HARDWARE ON DOORS Asbestos Code A - Clear for repairs on 01/14/05. DCPS Safety - Richard Gibson (RG) January 13, 2005 March 2, 2006 413 days
FM-200457972 04 3/2/06 Miller, Kelly Gym and stairwell # 1 Need to have hole in wall repaired. Asbestos Code A - Clear for repairs on 11/05/04. DCPS Safety - Richard Gibson (RG) November 5, 2004 March 2, 2006 482 days
FM-200619180 06 3/13/06 "Emergency" Fabricate and install four designed guards over vents for safety reasons.contractor's vents are very unsafe. Asbestos Code A - Clear for repairs on 03/01/06 Tidewater - Thomas Johnson (RG 03/01/05) February 27, 2006 March 13, 2006 14 days
FM-200621748 06 4/27/06 First Floor-Need partition in boy's restroom repaired. (2) Asbestos Code A - Clear for repairs on 04/25/06. DCPS Safety - Richard Gibson (RG) April 25, 2006 April 27, 2006 2 days
FM-200621752 06 4/27/06 Repair cafeteria door near gym, unable to secure. Asbestos Code A - Clear for repairs on 04/25/06. DCPS Safety - Richard Gibson (RG) April 25, 2006 April 27, 2006 2 days
FM-200512264 05 5/15/06 Miller Boilerroom Remove Safety valves and cap off boilers # 1 and # 3 so that the engineer can perform hydro on the boilers. PER BOILER INSPECTOR'S REQUEST September 11, 2005 May 15, 2006 246 days
FM-200627234 06 11/28/06 Third Floor/Ceiling tile missing, hallway right of elevator. Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson (RG) August 11, 2006 November 28, 2006 109 days
FM-200627265 06 11/28/06 Second Floor/Ceiling tile missing hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 November 28, 2006 109 days
FM-200627261 06 11/28/06 Second Floor/Ceiling tile missing 214 Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 November 28, 2006 109 days
FM-200627247 06 11/28/06 Third Floor/Ceiling tile missing, hallway next to 305 Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson (RG) August 11, 2006 November 28, 2006 109 days
FM-200627266 06 12/1/06 Third Floor/Bathroom partition broken and missing. Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 December 1, 2006 112 days
FM-200627280 06 12/6/06 First Floor/Door Missing In Hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 December 6, 2006 117 days
FM-200627271 06 12/7/06 First Floor/Missing ceiling tile in hallway Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 December 7, 2006 118 days
FM-200629853 06 3/1/07 Replacement of damaged or missing ceiling tile throughout the building. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. DCPS Safety - Richard Gibson (RG 09/22/06) September 22, 2006 March 1, 2007 160 days
FM-200633022 2/8/06 3/1/07 First Floor - Girl's Bathroom Near Gym - R/R Partition, it fell down Asbestos Code A - Clear for repairs on 12/08/06. DCPS Safety - Richard Gibson (RG) December 8, 2006 March 1, 2007 83 days
FM-200506068 05 3/1/07 (Miller) Asbestos Assessment Required. Main lobby area. Install dedication plaque in specified area. Asbestos Code A - Clear for repairs on 05/27/05. DCPS Safety - Richard Gibson (RG) May 27, 2005 March 1, 2007 643 days
FM-200627267 06 3/29/07 Second Floor/Glass broken front stairwell Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 March 29, 2007 230 days