Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Kenilworth ES

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200104973 3/5/01 9/26/01 KENILWORTH NEW SIDE THIRD (3RD) FLOOR - NEW SIDE/BACK STAIRWELLS 1) ASBESTOS ASSESSMENT REQUIRED 2) DO ASBESTOS ABATEMENT ON BACK STAIRWELL OF THE BUILDING LEADING TO THE THIRD FLOOR. ACCESS MAY BE REQUIRED. (FLOOR TILE) URGENT! CODE A-CLEAR FOR REPAIRR BY HORNE ENG RAY AGNANT 8/24/01. March 5, 2001 September 26, 2001 205 days
FM-200121169 01 11/17/01 (KENILWORTH) !!EMERGENCY!! 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/ROOM #129: REPAIR OR REPLACE CEILING; DAMAGED FROM PIPE LEAK. PIPE WAS REPAIRED, CEILING WAS NEVER REPAIRED, CEILING TILES FELL ON TEACHERS HEAD THIS MORNING. (INSTRUCTED TO ISOLATE THE ROOM) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/04/01. CHARLES BUCHANAN - SAFETY (202)576-5582 October 9, 2001 November 17, 2001 39 days
FM-200108487 01 11/21/01 KENILWORTH SECOND (2ND) FLOOR - COMPUTER LAB/ROOM 202 THE WINDOW A/C UNIT MOTOR DOES NOT WORK. THE A/C UNIT MOTOR REPLACED. THE COMPUTERS WILL NOT FUNCTION PROPERLY IN AN OVERHEATED ENVIRONMENT. ASBESTOS CODE A-CLEAR FOR REPAIR BY 11/09/01 DCPS SAFETY SRH April 16, 2001 November 21, 2001 219 days
FM-200108483 02 1/12/02 KENILWORTH FIRST (1ST), SECOND (2ND) AND THIRD (3RD) FLOOR THROUGHOUT BUILDING TH CHANGE LOCKES ON ALL CLASSROOM DOORS AND REKEY TO A MASTER. REKEY ALL CLASSROOM DOORS THROUGH-OUT 1ST, 2ND AND 3RD FLOORS OF BUILDING. ALSO REKEY LOCKS ON RESTROOM DOORS THROUGH OUT THE 1ST, 2ND AND 3RD FLOORS. SAFETY AND SECURITY HAZARD. January 10, 2002 January 12, 2002 2 days
FM-200203831 02 3/8/02 (Kenilworth) **Very Urgent** 1st floor/Back of building: Window has fallen out of frame, and staff is unable to secure. March 5, 2002 March 8, 2002 3 days
FM-200205704 02 6/13/02 Kennilworth ****Urgent**** Asbestos Assessment Reqd. 1st Floor Room 122 A line is leaking from the ceiling in Room 122 and water is going across the floor. Code A-clear for repair by Honre Engineer ( Sheryll James) on 4/12/02 CEB April 11, 2002 June 13, 2002 63 days
FM-200213726 02 8/9/02 (Kenilworth) Fire code violation: 1st Floor/room #107: Door inoperable. Asbestos Code A - Clear for repairs on 08/07/02. DCPS-Safety - Leroy Minton Jr. (RG 08/08/02) August 7, 2002 August 9, 2002 2 days
FM-200213723 02 8/9/02 (Kenilworth) Fire code violation: 3rd Floor/313: Door not closing properly. Asbestos Code A - Clear for repairs on 08/07/02. DCPS-Safety - Leroy Minton Jr. (RG 08/08/02) August 7, 2002 August 9, 2002 2 days
FM-200213728 02 8/30/02 (Kenilworth) Fire code violation Through-out school: Ceiling tile missing in all different wings. Asbestos Code A - Clear for repairs on 08/07/02. DCPS-Safety - Leroy Minton Jr. (RG 08/08/02) August 7, 2002 August 30, 2002 23 days
FM-200221889 02 3/26/03 KENILWORTH ROOM 304 1. ASBESTOS ASSESSMENT MAY BE REQUIRED. 2. PULL AND FLUSH HOT WATER HEATING COIL. COIL HAS NO CIRCULATION Asbestos Code A-clear for repair by DCPS on 12-09-02 Safety Charles Buchanan December 3, 2002 March 26, 2003 113 days
FM-200207188 02 4/30/03 Kenilworth ****Urgent**** Outside Grounds/Main Entrance Remove a large branch that fell from a tree, during last week's storm, in the front of the school. May 6, 2002 April 30, 2003 359 days
FM-200217961 02 4/30/03 Kenilworth ****Urgent**** Asbestos Assessment Reqd. 3rd Floor Boys' Restroom Two sinks are backed up and there is water running from one to the other. [NOTE: After observing the job, it was decided that the wall had to be penetrated to effect repair.] Asbestos Code A - Cleared for repairs on 10-21-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. September 20, 2002 April 30, 2003 222 days
FM-200224533 03 5/1/03 (Kenilworth) 1. Asbestos Assessment Required. 3rd Floor/Room #303: Door cracked and off hinges; removed door for safety purposes. Asbestos Code A-clear for by Safety Office on 01/29/03 Charles Buchanan January 24, 2003 May 1, 2003 97 days
FM-200217964 02 5/1/03 Kenilworth Asbestos Assessment Reqd. 1st Floor 101 Old Wing The frame around the wooden door is cracked. Asbestos Code A - Clear for repairs on 10/18/02. DCPS Safety - Leroy Minton Jr. (RG 10/21/02) September 20, 2002 May 1, 2003 223 days
FM-200206426 02 5/19/03 Kenilworth Asbestos Assessment Reqd. 1st Floor Auditorium Lobby Replace exterior doors . There are multiple problems with the newly installed doors. Asbestos Code A - Clear for repairs on 04/25/02. DCPS Safety - Richard Gibson (RG 04/25/02) April 24, 2002 May 19, 2003 390 days
FM-200336684 03 9/2/03 (Kenilworth) !!!URGENT!!! 1st Floor/Through-out building: Pepco was called after electrical power failure, need electrician to come out and make repairs in main fuse box. September 2, 2003 September 2, 2003 0 days
FM-200338596 03 10/15/03 (Kenilworth) !!!URGENT!!! 1st Floor/Lobby: Window vandalized, shattered. Please respond as soon as possible, they will return to gain access to the inside, as this window is located on the 1st floor. October 7, 2003 October 15, 2003 8 days
FM-200448939 04 6/4/04 (Kenilworth) !!!VERY URGENT!!! 1st Floor/Room #122: Water, and paper backing up in toilet, attempting to run over. Staff had no success in using plunger. June 4, 2004 June 4, 2004 0 days
FM-200452292 04 11/16/04 Kenilworth FIRE CODE VIOLATION: First floor Broken door closer exit door by the office. Asbestos Code A - Clear for repairs on 09/09/04. DCPS Safety - Leroy Minton Jr. (RG 09/09/04) August 11, 2004 November 16, 2004 97 days
FM-200456561 04 1/4/05 Kenilworth Urgent !!! First Floor - Teachers Bathroom 1) Water leaking from ceiling. Ceiling have fallen. Asbestos Code A - Clear for repairs on 10/27/04. DCPS Safety - Leroy Minton Jr. (RG 10/29/04) October 7, 2004 January 4, 2005 89 days
FM-200452287 04 5/4/05 Kenilworth FIRE CODE VIOLATION: Missing ceiling tile through out school. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) August 11, 2004 May 4, 2005 266 days
FM-200457497 /04 5/13/05 Kenilworth First floor health suite Repair or replace door. Asbestos Code A - Clear for repairs on 08/28/04. DCPS Safety -Leroy Minton Jr. (RG 08/29/04) October 27, 2004 May 13, 2005 198 days
FM-200452723 04 6/20/05 (Kenilworth) FIRE CODE VIOLATION: 1st Floor: Door closer broken on stairwell door (back starwell door on 1st floor) Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Richard Gibson (RG 08/29/04) August 16, 2004 June 20, 2005 308 days
FM-200457053 /04 8/1/05 Kenilworth Kitchen Screen door to the entrance of kitchen, also cafeteria was sited for the screen last year. Asbestos Code A - Clear for repairs on 10/19/04. DCPS Safety - Richard Gibson (RG) October 19, 2004 August 1, 2005 286 days
FM-200514715 /05 11/3/05 (Kenilworth) "Urgent" First Floor, Corridor Near Auditorium. Repair or Replace water cooler. October 27, 2005 November 3, 2005 7 days
FM-200449986 04 11/18/05 (Kenilworth) !!!VERY URGENT!!! Unable to lock door to handicap ramp. July 7, 2004 November 18, 2005 499 days
FM-200340469 /03 11/18/05 (Kenilworth) !!!VERY URGENT!!! 1st Floor/Teachers Lounge: Hot water leaking profusely from the ceiling. November 19, 2003 November 18, 2005 730 days
FM-200450324 04 11/18/05 (Kenilworth) !!!VERY URGENT!!! Door to Handicap Ramp: Repair slide bolt on door, damaged by vandals. (Unable to secure) July 15, 2004 November 18, 2005 491 days
FM-200217617 02 11/18/05 (Kenilworth) ***VERY URGENT*** 1st Floor/Auditorium: Due to break-in, replace two (2) broken windows. September 17, 2002 November 18, 2005 1,158 days
FM-200213336 02 11/18/05 Kenilworth 1. Asbestos Assessment Reqd. 1st Floor Health Suite 2. Repair floor tiles in the health suite. Water damaged has caused the tiles to come up from the floor. Work brought to Sheila R. Howard's attention by Vincent Reed of the Shaw Group 07-30-02. SRH called Eric Dreher, BSM to generate the work order, the damage supposedly happened the weekend of July 20, 2002. Asbestos Code A - Abated and cleared for repairs on 08-23-02 (LM / 10-30-02) per Leroy Minton confirmation. Safety Office (202) 576-8962. July 30, 2002 November 18, 2005 1,207 days
FM-200508603 05 11/18/05 KENILWORTH First fl. Entrance Repair Windows Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. July 25, 2005 November 18, 2005 116 days
FM-200509738 05 12/6/05 Kenilworth Fire Code Violation - IFC 110.1 New Building - First Floor - Room 122 ( Kindergarden ) 1) Ceiling tile missing. Asbestos Code A - Clear for repairs on 08/09/05. DCPS Safety - Richard Gibson (RG) August 8, 2005 December 6, 2005 120 days
FM-200452293 04 12/27/05 Kenilworth FIRE CODE VIOLATION: First floor Exit door won't close properly Pre-K. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Richard Gibson (RG 08/29/04) August 11, 2004 December 27, 2005 503 days
FM-200120534 01 2/3/06 (KENILWORTH) 1. ASBESTOS ASSESSMENT REQUIRED. TEACHERS LOUNGE: There is hole in the ceiling. ASBESTOS CODE A-CLEAR FOR REPAIR 12/03/01 BY DCPS SAFETY CE BUCHANAN 202 439 7840 THE LEAK ABOVE 12 BY 12 CEILING TILE IS STILL LEAKING IN TEACHER LOUNGE. September 25, 2001 February 3, 2006 1,592 days
FM-200620247 06 3/24/06 First Floor-Boys Restroom (new wing) Very Urgent 2 sinks have water running constantly-can't turn off the water-valves are striped-need faucet and cut off valves replaced. March 23, 2006 March 24, 2006 1 day
FM-200515229 05 5/22/06 Urgent: One row of lights went out in classroom 216 on the second floor. Need the bulbs replaced. November 8, 2005 May 22, 2006 195 days
FM-200617510 06 5/31/06 Kenliworth Boiler Room Replace bolt,nuts, and flange gasket on hot water supply and return line flange on heat exchange (Bolt where removal by contractor) Heat exchange is just hanging. Urgent !!!!! January 18, 2006 May 31, 2006 133 days
FM-200514749 /05 6/2/06 Kenilworth Proposed Wetland Ms Utility - Ticket - 5560200 1) The wetland will be located along the side of the school and will be enclosed by an eight foot tall fence with a locked gate added for controll access and safety purposes. October 28, 2005 June 2, 2006 217 days
FM-200221121 /02 8/25/06 KENILWORTH Boiler room "URGENT" Repair heat exchanger leaking at the flange. NOTE: IF NOT REPAIRED EXCHANGER WILL RUST OUT CAUSING BUILDING TO POSSIBLE HAVE NO HEAT. Code A - clear for repairs as of 10/1/03 by safety Sylvia Grimes. November 18, 2002 August 25, 2006 1,376 days
FM-200634027 /07 2/5/07 First Floor - Stage Left - In vestible area missing ceiling tile (IFC703.1) Reinspection on 1-30-07 Asbestos Code A - Clear for repairs on 01/17/07. DCPS Safety - Richaed Gibson (RG) 02/09/2007 07:10 TH - Completed 2/8/07 per Principal Fatima Johnson, Earnest Palmer and inspection January 17, 2007 February 5, 2007 19 days
FM-200618938 06 2/15/07 Exterior of Building. "Urgent" Repair or Replace exterior lighting. Note: This is a safety hazard. February 21, 2006 February 15, 2007 359 days