FM-200117137 01 8/30/01 M.L. KING ROOM 307 REPLACE (2) 25,000 BTU WINDOW A/C UNITS. FURNISH. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 08/15/01. SYLVIA GRIMES - SAFETY (202)576-5583 August 10, 2001 August 30, 2001 20 days
FM-200122644 /01 11/17/01 (KING) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ ROOM 116 BATHROOM WE NEED TO HAVE (1) TOILET RESET IT IS LEAKING FROM THE BASE THE 1ST STALL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/05/01 LEROY MINTON - SAFETY (202)576-6691(RG) October 30, 2001 November 17, 2001 18 days
FM-200119327 01 12/5/01 (KING) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOMS 304 AND 321 POWER KEEPS GOING OUT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/10/01. LEROY MINTON - SAFETY (202)576-6693 September 6, 2001 December 5, 2001 90 days
FM-200203283 02 2/28/02 (M.L. King) **Urgent** 1. Asbestos Assessment Required. 2nd floor/Classroom #216: Lock is jam shut; unable to get door open. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/25/02 HORNE ENGINEER: Z MAHMOOD February 21, 2002 February 28, 2002 7 days
FM-200212542 02 7/23/02 King ****Very Urgent**** 2nd Floor Teachers' Lounge Grate was pulled away from the window in the teachers' lounge for illegal access and theft of computers. Replace or repair grate and secure it strongly enough to prevent further break-in. July 22, 2002 July 23, 2002 1 day
FM-200212604 02 7/23/02 King ****Urgent**** 1st & 2nd Floor Rms. 118 & 219 Change lock on room 118 & 219 due to a recent break-in. July 23, 2002 July 23, 2002 0 days
FM-200213525 02 8/7/02 King ****Urgent/BREAK-IN**** 2nd Floor Classroom 216 Knob lock is broken due to a break-in and needs to be replaced. August 5, 2002 August 7, 2002 2 days
FM-200217809 02 9/18/02 (King) !!!VERY URGENT!!! 3rd Floor/boys restroom: Floor drain stopped up, flooding the floors, and running out in the hallway. September 18, 2002 September 18, 2002 0 days
FM-200217907 02 10/10/02 King ****Urgent/BREAK-IN**** Exterior of Building Install window guards on the front and back side of the building. There has been a break-in 9/18/02. Need to prevent further break-ins and theft of equipment. September 19, 2002 October 10, 2002 21 days
FM-200221087 /02 11/22/02 (King) !!!URGENT!!! Boiler room: Replace lock on boiler room door; engineer dropped key in storm drain. November 15, 2002 November 22, 2002 7 days
FM-200223416 03 1/9/03 (King) !!!VERY URGENT!!! Out-side/Parking lot area: Due to break-in, window broken, and window guards were pulled away from the window. January 2, 2003 January 9, 2003 7 days
FM-200220121 /02 1/17/03 M. L. King Front Entrance - Main Doors 1) Survey, fabricate and install window guards. Paint window guards. Asbestos Code A - Clear for repairs on 10/30/02. DCPS Safety - Leroy Minton Jr. (RG 10/31/02) October 28, 2002 January 17, 2003 81 days
FM-200224245 03 1/21/03 (King) !!!VERY URGENT!!! 2nd Floor/Girls bathroom: Girls #7 toilet stopped up, water running over on the floor. (Custodian will isolate restroom until repair personnel arrives) January 21, 2003 January 21, 2003 0 days
FM-200225834 03 2/14/03 Paul !!! URGENT !!! FIRST FLOOR - BOYS RESTROOM 1) Repair or replace urinal traps and pipes . ( very bad smell - Health Hazard ) February 14, 2003 February 14, 2003 0 days
FM-200221290 /02 3/14/03 (King, M.L.) !!!URGENT!!! 1. Asbestos assessment required. Stairwell #A: Hand rails are broken; rails and hooks have broken completely off the wall. Asbestos Code A-clear for repair by Horne Engineer DCPS Safety on 11/21/02 Charles E. Buchanan November 19, 2002 March 14, 2003 115 days
FM-200224887 03 3/28/03 King, M. L. Jr. First floor - cafeteria Need to have a 4" pipe replace under the kitchen sink it is leaking. URGENT January 30, 2003 March 28, 2003 57 days
FM-200223417 03 5/19/03 (King) !!!VERY URGENT!!! Out-side/Parking lot area: Due to break-in, window broken, and window guards were pulled away from the window. January 2, 2003 May 19, 2003 137 days
FM-200227509 03 3/2/04 (King) !!!VERY URGENT!!! Third floor/Boys restroom: We need to have # 3, 4 urinal snaked out; They are stopped up, and water is running on the floor. March 24, 2003 March 2, 2004 344 days
FM-200451335 04 8/31/04 KING Boiler # 1 Replace leaking flange gasket on safety valve discharge line on boiler # 1 August 3, 2004 August 31, 2004 28 days
FM-200501931 05 3/3/05 King, M.L. EMERGENCY Need all stained ceiling tile replaced before March 6, 2005 for mid state assessment. Ceiling tile is on site. Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 03/02/05) February 23, 2005 March 3, 2005 8 days
FM-200452305 04 4/5/05 King, M.L. FIRE CODE VIOLATION: Third floor Classroom # 313 door not closing properly. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety Leroy Minton Jr. (RG 09/24/04) August 12, 2004 April 5, 2005 236 days
FM-200456798 /04 8/1/05 (King) HEALTH CODE VIOLATION: Kitchen: Shelves in storage room are rusted. (Paint and seal). Asbestos Code A - Clear for repairs on 10/14/04. DCPS Safety - Richard Gibson.(RG) October 13, 2004 August 1, 2005 292 days
FM-200456800 /04 8/1/05 (King) HEALTH CODE VIOLATION: Kitchen: Screen at back door is damaged (torn) and missing. Flies, and bee's in kitchen area; repair screen to prevent entry of pests. Asbestos Code A - Clear for repairs on 10/14/04. DCPS Safety - Richard Gibson (RG) October 13, 2004 August 1, 2005 292 days
FM-200456732 /04 8/1/05 (King) !URGENT! Kitchen/Cafeteria: We need to have a sink trap placed on the sink in the kitchen. October 12, 2004 August 1, 2005 293 days
FM-200456791 /04 8/1/05 (King) !!!VERY URGENT!!! 1st Floor/Rooms #117 1) No electrical power in rooms indicated. October 13, 2004 August 1, 2005 292 days
FM-200452307 04 8/26/05 King, M.L. FIRE CODE VIOLATION: First floor Classroom # 115 door not closing properly. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety Leroy Minton Jr. (RG 09/24/04) August 12, 2004 August 26, 2005 379 days
FM-200452306 04 8/26/05 King, M.L. FIRE CODE VIOLATION: Third floor Handle missing stairwell A. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) August 12, 2004 August 26, 2005 379 days
FM-200452313 04 8/26/05 King, M.L. FIRE CODE VIOLATION: First floor Cafeteria door is hard to open (opposite end of stage). Asbestos Code A - Clear for repairs on 09/23/04. DCPS Safety Leroy Minton Jr. (RG 09/24/04) August 12, 2004 August 26, 2005 379 days
FM-200452308 04 8/26/05 King, M.L. FIRE CODE VIOLATION: First floor Classroom # 114 door not closing properly. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety Leroy Minton Jr. (RG 09/24/04) August 12, 2004 August 26, 2005 379 days
FM-200452309 04 8/26/05 King, M.L. FIRE CODE VIOLATION: First floor Classroom # 122 ceiling tile hanging down. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety Leroy Minton Jr. (RG 09/24/04) August 12, 2004 August 26, 2005 379 days
FM-200513482 05 12/23/05 King Very Urgent First Floor-Investigate, to find out why the water pressure is low on water coolers October 4, 2005 December 23, 2005 80 days
FM-200458145 /04 3/8/06 King Room 122 first floor Replace ceiling tile, tile is hanging down. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) November 10, 2004 March 8, 2006 483 days
FM-200340545 /03 3/8/06 (King) !!!URGENT!!! 2nd Floor/Room #223: 1) No lights in the classroom. November 20, 2003 March 8, 2006 839 days
FM-200334499 03 3/8/06 (King) !!VERY URGENT!! 1st Floor/Main Office: 1) Power is lost to all electrical outlets in this room. August 5, 2003 March 8, 2006 946 days
FM-200333531 03 3/8/06 King, M. L. Jr. Vandalism First floor main office Need to have 2 windows replace. They were broken by kids throwing rocks. URGENT July 22, 2003 March 8, 2006 960 days
FM-200227386 03 3/8/06 (King) !!!VERY URGENT!!! 1st Floor/Boys restroom: We need to have #1 urinal snaked out; urinal is stopped up, and water is running on the floor. March 20, 2003 March 8, 2006 1,084 days
FM-200500899 05 3/8/06 KING KITCHEN-RESTROOM TOILET STOPED-UP WATER ON FL. Asbestos Code A - Clear for repairs on 01/28/05. DCPS Safety - Richard Gibson (RG) January 27, 2005 March 8, 2006 405 days
FM-200221779 02 3/8/06 King, M.L. Jr. Third floor - room 321 Need to have a chalkboard partition repair. The handler on the door is broken. Asbestos Code A-clear for repair by DCPC Safety Charles E. Buchanan on 12/03/02 December 2, 2002 March 8, 2006 1,192 days
FM-200501932 05 3/8/06 King, M.L. EMERGENCY Paint ceremic tile in lobby main lobby entrance due to sun and old age before March 6, 2005 for mid state assessment. Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 03/02/05) February 23, 2005 March 8, 2006 378 days
FM-200502286 05 3/8/06 (King) Asbestos assessment required. Second floor/room 211. Repair or replace broken door closer. Asbestos Code A - Clear for repairs on 03/08/05. DCPS Safety - Richard Gibson (RG) March 7, 2005 March 8, 2006 366 days
FM-200219717 /02 3/8/06 King, M.L. Jr. Classroom 117- Bathroom 1) Need to have lights checked, they will not come on (the bulbs have been change). Asbestos Code A - Cleared for repairs on 10-23-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. October 21, 2002 March 8, 2006 1,234 days
FM-200513743 /05 3/8/06 King Very Urgent Cafeteria Storage Room-A Check and repair the lights, they will not come on. October 12, 2005 March 8, 2006 147 days
FM-200513744 /05 3/8/06 King Very Urgent Rooms 114, and 127A-Repair/Replace the door handles. Code A-clear for repair by DCPS Charles Buchanan 10/13/05 Repair was complete by DCPS shop. October 12, 2005 March 8, 2006 147 days
FM-200513745 /05 3/8/06 King Very Urgent Third Floor-Teachers Bathroom Repair/Replace the toilet, it's leaking from the bottom. October 12, 2005 March 8, 2006 147 days
FM-200619839 06 3/16/06 Very Urgent Front Entrance door lock jamed-Can't get in or out. March 14, 2006 March 16, 2006 2 days
FM-200632846 06 12/12/06 HVC04 - To repair # 1 and 2 boilers, have to reset continuously. Urgent Boilers will not run for more than 3 hours. Was previously report as low gas pressure problems/troubles December 4, 2006 December 12, 2006 8 days
FM-200618310 06 1/26/07 Very Urgent First Floor-Main Office/Lobby Check and repair light fixtures that are not working, bulbs were changed February 6, 2006 January 26, 2007 354 days
FM-200450824 04 1/26/07 King Outside front side of building Need to have 3 trees cut down. Safety Hazard July 27, 2004 January 26, 2007 913 days
FM-200631506 /06 1/26/07 Exterior of Building/Playground Area. Repair hole in fence. Note: A child was injured when pushed through this hole in the fence. October 30, 2006 January 26, 2007 88 days
FM-200501928 05 3/27/07 King, M.L. Need 15 two(2) amp light ballast, and need installation before March 6, 2005 for mid state assessment. Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 03/02/05) February 23, 2005 March 27, 2007 762 days
FM-200620127 06 3/27/07 First Floor-Health Suite Place cover over telephone wires Safety Hazard March 21, 2006 March 27, 2007 371 days
FM-200510898 05 3/27/07 King Boiler Room Repair problem on lights in boiler room, Fire comes from lights when you turn on the lights, then the breaker shuts off. Safety Hazard !!!!! August 22, 2005 March 27, 2007 582 days
FM-200455630 04 3/27/07 King First floor by 114 circuit breaker box Need to have # 8 circuit breaker replace light in the teacher bathroom will not come on. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety Richard Gibson. (RG) September 24, 2004 March 27, 2007 914 days