Description Open Date
FM-200219245 10/10/02 (King) !!!VERY URGENT!!! 1st Floor Hallway: The outside lights surrounding the building is malfunctioning. In order to display outside lights, the lights in the 1st floor hallway will have to remain on. Due to the break-ins at this school, and other schools in the area, the lights exposes to much inside the building, however, ("we need the lighting in the outside area".) October 10, 2002
FM-200450243 7/14/04 King Third floor room 311 Need to have electrician to run a 220 line so we can install an AC unit. Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) July 14, 2004
FM-200701462 3/12/07 Boiler room - URGENT - Repairs are needed immediately - Both heating hot water circulating primary pump # 1 and secondary pump are inoperable, will not run. Needed to heat bldg. March 12, 2007