Closed Repair Requests: January 2002

See Also: All Closed Repair Requests at Kramer Middle School

January 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 39 Days
  • Routine Requests
    7
    Average Time Elapsed: 29.3 Days
  • Total Requests
    8

Detailed Reports

Urgent Repair Requests Completed in January 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200124247 /01 1/8/02 (KRAMER) 1ST FLOOR/GYMNASIUM & CAFETERIA REPLACE OR REPAIR DRINKING FOUNTAINS OR WATER COOLER @ 1ST FLOOR GYM AND CAFETERIA ASBESTOS CODE A-CLEAR FOR REPAIR 12/03/01 BY DCPS SAFETY : RONALD EDWARDS 202 439 8094 November 30, 2001 January 8, 2002 39 days

Routine Repair Requests Completed in January 2002 (7)
Description Open Date Close Date Time Elapsed
FM-200126487 02 1/8/02 (KRAMER) ***EMERGENCY*** 2ND FLOOR CORRIDOR BY STAIRWELL "A" WINDOW LEADING OUTSIDE IS DAMAGED FROM TAMPERING FOR ILLEGAL ENTRY--SECURITY BARS ARE DOWN, HINGES TORN OUT & WINDOW PUSHED IN. NEED IMMEDIATE ATTENTION TO PREVENT FURTHER ATTEMPT AT UNLAWFUL ENTRY. January 2, 2002 January 8, 2002 6 days
FM-200126667 02 1/10/02 (KRAMER) 2ND FLOOR/ROOM #206 CLASSROOM: STUDENTS BELONGINGS LOCKED IN CLASSROOM; THERE ARE NO KEYS TO FIT THE DOOR. January 8, 2002 January 10, 2002 2 days
FM-200125234 /01 1/11/02 (KRAMER) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ MAIN ENTRANCE DOOR INSTALL METAL PLATED SIGN FOR AFTER CARE PROGRAM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/26/01 HORNE ENGINEERING - SHERYL JAMES (RE) December 13, 2001 January 11, 2002 29 days
FM-200127321 02 1/13/02 SURVEY CITY SCHOOLS TO DETERMINE SNOW OR ICY CONDITIONS BEFORE SCHOOL OPENING GROUNDS PERSONNEL ON STAND BY. SCHOOLS INSPECTED WERE WILSON, BRIGHTWOOD, F.JOHNSON, HAMILTON, DUNBAR, M.D. LEE, SHARPE HEALTH, P.R. HARRIS, AND THURGOOD MARSHALL. January 11, 2002 January 13, 2002 2 days
FM-200120255 01 1/18/02 (KRAMER) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ ROOM 213 NO WATER RUNNING TO COMMODE CUT OFF VALVE MAY NEED TO BE REPAIRED OR REPLACED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/28/01. HORNE ENGINEERING - BIPIN NANAVATY (RG) September 21, 2001 January 18, 2002 119 days
FM-200124541 01 1/18/02 (KRAMER) ASBESTOS ASSESSMENT REQUIRED FIRST FLOOR/GIRLS RESTROOM REPAIR OR REPLACE CONTROL VALVE, TRAP & DRAIN PIPE WHERE SINK IS LEAKING WATER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/05/01. HORNE ENGINEERING - TROY WILCOME (RG) December 5, 2001 January 18, 2002 44 days
FM-200201076 02 1/18/02 (KRAMER) ***EMERGENCY*** 1ST FLOOR PRINCIPALS OFFICE RESTROOM SHUT-OFF VALVE ON THE COMMODE IN THE PRINCIPALS OFFICE IS LEAKING WATER ONTO THE FLOOR & NEEDS IMMEDIATE ATTENTION. January 15, 2002 January 18, 2002 3 days