Closed Repair Requests: January 2003
See Also: All Closed Repair Requests at Kramer Middle School
January 2003 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200220426 /02 1/14/03 Kramer First floor - Stairwell 0 Fifth (5th) step heading down, needs repair and 0r replaced. Safety Hazard | |||
| FM-200221673 /02 1/14/03 (Kramer) 1st Floor Gym/Girls locker room: Ceiling tile has fallen from water damage on tile. Please repair as soon as possible. Asbestos Code A - Clear for repairs on 12/04/02. DCPS-Safety - Leroy Minton Jr. (RG 12/04/02) | |||
| FM-200210779 02 1/14/03 Kramer 1st Floor Principal's Office Change the lock on the hall door leading into the principal's office---need to protect & secure computers and other valuables kept there. Asbestos Code A - Cleared for repairs on 07-05-02 (LM) Leroy Minton Safety Office 202-576-8962. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200221674 /02 1/10/03 (Kramer) !!As soon as possible!! Outside grounds: Repair or replace fence, torn down facing 18th Street side. | |||
| FM-200222476 /02 1/10/03 Kramer Rear parking lot Gate is off track. Please repair ASAP | |||
| FM-200216968 02 1/14/03 Kramer MS Basement - Rear exit door Door is warp, the other door latch is missing, both is still in place cannot open fire door. Asbestos Code A-clear for repair by DCPS Charles E Buchanan on 9/11/02 | |||
| FM-200216930 02 1/14/03 Kramer 1st Floor Lobby Area, Wings & Lower Level Install panic bars and door closures on ten exit doors. [Fire marshall cited this school/fire hazard.] | |||
| FM-200216355 02 1/14/03 Kramer 1st Floor Level Courtyards Birds have returned to the courtyard ledges and a/c units---need problem eradicated. | |||
| FM-200208374 02 1/14/03 Kramer First (1st) Floor - Auditorium 1. Asbestos Assessment Required. 2. Need for the shop to install a bracket in the wall to hang window curtain for very important Community Meeting. | |||
| FM-200222523 /02 1/14/03 (Kramer) 1st Floor/Room #106: Student broke wire mesh glass. | |||
| FM-200221579 /02 1/14/03 Kramer Basement - Kitchen 1) Water coming through light fixtures over the stove were they cook at. | |||
| FM-200221469 /02 1/14/03 Kramer First Floor - Stairwell D Exit Door 1) The door is off the hinges and the screws are broken off into the wall. | |||
| FM-200218643 02 1/14/03 Kramer - T-5 First Floor - Gymnasium room 109 Fire glass broken. Gym door transom, Repair and/or replace next to room 107. Transpm fire mesh glass broken. Replace security bar over front exit door. | |||
| FM-200210794 02 1/14/03 Kramer Basement Boiler Room #4 Water is running into the sink--there is no shut-off valve. Repair or replace fixture parts. | |||
| FM-200208606 02 1/14/03 Kramer 1. Asbestos Assessment Reqd. 2nd Floor Girls Restroom 2. Repair the 19 1/2"x30" hole in the wall under the basin in the 2nd-floor girls' restroom. Asbestos Code A - Clear for repairs on 05/29/02. Horne Engineering - Sheryll James (RG) | |||
| FM-200214844 02 1/17/03 Kramer F-303.4 Fire Code Violation 1st Floor Girls' Locker Room Entry door not latching. | |||
| FM-200214817 02 1/17/03 Kramer F-303.4 Fire Code Violation 2nd Floor Stairwell C Door has missing screw. | |||
| FM-200214847 02 1/17/03 Kramer F-303.4 Fire Code Violation 1st Floor Auditorium Entry door not latching. | |||
| FM-200214846 02 1/17/03 Kramer F-303.4 Fire Code Violation 1st Floor Dark Room Missing hardware on dark room door. | |||
| FM-200223869 03 1/22/03 Shadd First floor - room 110 Defective hardware on door. Fire code violation. | |||
| FM-200223086 /02 1/29/03 Kramer Rooms - 111a, Mr. Sheffy and Mr. Parker 1) Check areas indicated on the blue prints for asbestos. Scope of work - Holes need to be drilled were indicated on blue prints. Installation of (3) ISDN lines in a for mentioned Rooms. Verizon - James Taylor - 442-5533 Floor Plans are in the Service Center....... Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Charles Buchanan on 12/30/02 |
© The Washington Post Company