Closed Repair Requests: January 2004

See Also: All Closed Repair Requests at Kramer Middle School

January 2004 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 139 Days
  • Routine Requests
    6
    Average Time Elapsed: 3.5 Days
  • Total Requests
    7

Detailed Reports

Urgent Repair Requests Completed in January 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200335926 03 1/6/04 (Kramer) !!!VERY URGENT!!! Basement/Outside Pit: Due to break-in, vandals broke parts to gate. Request welders to weld gate. August 20, 2003 January 6, 2004 139 days

Routine Repair Requests Completed in January 2004 (6)
Description Open Date Close Date Time Elapsed
FM-200442201 04 1/5/04 Kramer Boiler Room Check hot water circulating pump, pump not working properly, Emergency!!!!! January 5, 2004 January 5, 2004 0 days
FM-200442600 04 1/13/04 Kramer First Floor - Boys Locker Room 1) Cut off valve on urinal not working...Locker Room is flooding. January 13, 2004 January 13, 2004 0 days
FM-200442440 04 1/13/04 Kramer First floor room 105 Closet door nee to be rekeyed. ASAP January 9, 2004 January 13, 2004 4 days
FM-200442251 04 1/14/04 Kramer Boiler room Repair or replace domestic water circulating pump. January 6, 2004 January 14, 2004 8 days
FM-200442250 04 1/15/04 Kramer Boiler room Repair leaking man hole ring on the domestic hot water storage tank. January 6, 2004 January 15, 2004 9 days
FM-200442991 04 1/21/04 Kramer Boiler room Repair burner #1 cuts off in flame failure. Only (1) one of (3) three boilers will operate. January 21, 2004 January 21, 2004 0 days