Closed Repair Requests: October 2002

See Also: All Closed Repair Requests at Kramer Middle School

October 2002 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 104.7 Days
  • Routine Requests
    12
    Average Time Elapsed: 163.6 Days
  • Total Requests
    15

Detailed Reports

Urgent Repair Requests Completed in October 2002 (3)
Description Open Date Close Date Time Elapsed
FM-200213979 02 10/10/02 Kramer Doors Throughout Realign and/or adjust the following doors: Auditorium door, front exit door and side door is out of alignment; inside office door is not operating properly; the doors to rooms 3, 21, 303, 315 & 317 need adjustment; adn the cafeteria and rear exit doors are out of alignment. Asbestos Code A - Abated and cleared for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/20/02) August 9, 2002 October 10, 2002 62 days
FM-200209071 02 10/10/02 Kramer ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Gym/Girls' Locker Room 2. The water leak was repaired, however, we have found a weak spot and a water leak on the pipe needs to be repaired. Asbestos Code A - Clear for repairs on 06/06/02. Horne Engineering - Sheryll James (RG 06/06/02) June 6, 2002 October 10, 2002 126 days
FM-200209072 02 10/10/02 Kramer 1. Asbestos Assessment Reqd. 1st Floor Gym Stairwell #8 2. The 5th step from the top on stairwell #8 needs repair or replacement [safety hazard]. Asbestos Code A - Clear for repairs on 06/06/02. Horne Engineering - Sheryll James (RG 06/06/02) June 6, 2002 October 10, 2002 126 days

Routine Repair Requests Completed in October 2002 (12)
Description Open Date Close Date Time Elapsed
FM-200218991 02 10/9/02 Kramer M.S Routine Work 1. Check chemical level 2. Added water to pools 3. Back wash filters October 7, 2002 October 9, 2002 2 days
FM-200207892 02 10/9/02 Kramer Ground fl. Computer room Repair leaks on carrier split a/c unit. Unit has 2 leaks in it ad is freezing. up. May 16, 2002 October 9, 2002 146 days
FM-200218122 02 10/9/02 Kramer 1st Floor Room 103 Classroom door needs to be rekeyed, as well as the inside door. September 23, 2002 October 9, 2002 16 days
FM-200213978 02 10/9/02 Kramer Stairwell doors needs latch replacement; and the teachers' lounge needs a turn-style lock placed on it. August 9, 2002 October 9, 2002 61 days
FM-200101127 01 10/10/02 KRAMER ASBESTOS ASSESSMENT THROUGHOUT PLASTER WALLS AND CEILING NOTE: AREAS DAMAGED DUE TO DRAIN STOPPAGE ON ROOF LEAK, DRAIN HAS BEE UNSTOPPED AND ROOF FIXED MT-20001713 ASB MGR. ADDED - ORIGINAL INITIATED 1/12/01 (FJ) ASBESTOS CODE A - CLAER FOR REPAIRS 4/9/01 January 12, 2001 October 10, 2002 636 days
FM-200213286 02 10/10/02 (Kramer) !!!!!EMERGENCY!!!!! Cafeteria: Burning chemical smell and sparks coming from wall outlet. Outlet appears to be melting. July 29, 2002 October 10, 2002 73 days
FM-200205376 02 10/10/02 Kramer School 21 grass cuts for the summer April 3, 2002 October 10, 2002 190 days
FM-200113603 01 10/10/02 KRAMER ROOF 1) Q STREET SIDE DRAIN STOPPED UP June 19, 2001 October 10, 2002 478 days
FM-200206993 02 10/10/02 Kramer Middle School Basement Stairwell - South East Side 1) 3 inch drain backing up, 4 inches of water is in stairwell already. May 2, 2002 October 10, 2002 161 days
FM-200206502 02 10/10/02 Kramer 2nd & 3rd Floors/Corridors 2nd floor & 3rd floor lights are not working around the exit signs. [Poses a possible fire-code violation] April 24, 2002 October 10, 2002 169 days
FM-200217177 02 10/11/02 Kramer 2nd Floor Rooms 205 & 207 Repair and adjust lock on door to 205 to the other side; and rekey lock on door to room 207. September 10, 2002 October 11, 2002 31 days
FM-200220058 /02 10/25/02 Kramer Room 21 and cafeteria Room 21 and kitchen storeroom needs to be re-keyed. October 25, 2002 October 25, 2002 0 days

© The Washington Post Company