Closed Repair Requests: October 2006

See Also: All Closed Repair Requests at Kramer Middle School

October 2006 Summary

  • Urgent Requests
    7
    Average Time Elapsed: 600.4 Days
  • Routine Requests
    35
    Average Time Elapsed: 367.5 Days
  • Total Requests
    42

Detailed Reports

Urgent Repair Requests Completed in October 2006 (7)
Description Open Date Close Date Time Elapsed
FM-200450229 04 10/2/06 Kramer Basement cafeteria Teacher lounge plasteron wall needs repairing. Kitchen hall wall need repairing , maybe water damage, plaster. Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) July 14, 2004 October 2, 2006 810 days
FM-200340072 03 10/2/06 Kramer Basement stairwell A Lighting upgrade is needed on basement stairwell. Very dark, safety hazard. New fixture may be needed. Asbestos Code A - Clear for repairs on 11/10/03. Horne Engineering - Bipin Nanavaty (RG 11/12/03) November 7, 2003 October 2, 2006 1,060 days
FM-200512578 05 10/3/06 (Kramer) "Urgent" First floor, Boys' restroom. Repair leaking urinals in first floor boys' restroom, leak cause ceiling in basement boys' restroom to cave in and fall. September 14, 2005 October 3, 2006 384 days
FM-200506188 05 10/3/06 ( KRAMER ) URGENT!!! First Floor - Auditorium 1) Repair or Replace air conditioners. ( Promotional Ecercise Tuesday June 14, 05 ) June 1, 2005 October 3, 2006 489 days
FM-200503825 05 10/3/06 (Kramer) "Urgent" Weld backboards and rims, also install rods on basketball court poles. Note: The basketball goals are leaning. April 11, 2005 October 3, 2006 540 days
FM-200503761 05 10/3/06 ( KRAMER ) URGENT!!!! Basement - Room 09 1) Bulk pick up, univent, bleacher stand parts ,broken furniture. April 8, 2005 October 3, 2006 543 days
FM-200513046 05 10/4/06 Kramer Urgent Outside facing 18th st. side-Pipe cracked, leaking water September 22, 2005 October 4, 2006 377 days

Routine Repair Requests Completed in October 2006 (35)
Description Open Date Close Date Time Elapsed
FM-200452610 04 10/2/06 Kramer First floor porch lights front Lights on front of building out, please replace or repair. August 13, 2004 October 2, 2006 780 days
FM-200456411 04 10/2/06 Kramer First floor boys restroom 115 Commode stall 4 leaking water at base. Commode stall 7 need spud replacement. Fixtures on sinks need to be repaired or replace , vandalism. October 4, 2004 October 2, 2006 728 days
FM-200503440 05 10/2/06 Kramer Boiler Room Boiler #1 off on alarm, no heat in Building. Only Boiler working. March 31, 2005 October 2, 2006 550 days
FM-200503601 05 10/2/06 Kramer MS Boiler room Removed gas valves from # 2 and installed them on # 3 boiler April 6, 2005 October 2, 2006 544 days
FM-200449623 04 10/2/06 Kramer Basement room 6 Install A/C - window unit. Window H 4' W 4'x2" unit H-14" W 22" June 22, 2004 October 2, 2006 832 days
FM-200449189 04 10/2/06 Kramer Third floor room 312 Replace fire mesh glass. Vandalism fire code violation H 33 3/4" W 13 3/4" June 10, 2004 October 2, 2006 844 days
FM-200447958 04 10/2/06 Kramer First floor Auditorium A/C need to be repaired or replaced, ASAP. Graduation is schedule on June 15, 20004. May 14, 2004 October 2, 2006 871 days
FM-200338860 /03 10/2/06 Kramer Third floor corridor Ceiling is leaking water, could be the drains or brick work across from room 209. October 14, 2003 October 2, 2006 1,084 days
FM-200506270 05 10/3/06 (KRAMER) First Floor - Boys Restroom (115) 1) Basin sink is stopped up, there is a sewage smell comming out. June 2, 2005 October 3, 2006 488 days
FM-200512771 05 10/3/06 Kramer Rm 213 Repair door lock September 16, 2005 October 3, 2006 382 days
FM-200512526 05 10/3/06 Kramer First Floor-Room 107 - Replace the key to the room door September 14, 2005 October 3, 2006 384 days
FM-200510907 05 10/3/06 (Kramer) "Emergency" Gym, Boys locker room. Repair running urinals in the boys locker room. Area is flooding. August 22, 2005 October 3, 2006 407 days
FM-200509269 05 10/3/06 Kramer Auditorium Check electric outlet for to unit. No power to unit. Summer School Site August 1, 2005 October 3, 2006 428 days
FM-200505009 05 10/3/06 Kramer Boiler Room Boiler #2 needs gas line replace. May 2, 2005 October 3, 2006 519 days
FM-200504979 05 10/3/06 ( KRAMER ) First Floor - Room 106 1) Replace door, fire mesh glass. ( Vandelize. Fire Code ) May 2, 2005 October 3, 2006 519 days
FM-200514307 /05 10/4/06 Kramer Second Floor - Room 210 1) Key broke in lock, repair and replace key. October 23, 2005 October 4, 2006 346 days
FM-200617912 06 10/4/06 Second floor, Art Room # 205. "Emergency" Water coming through second floor ceiling and light fixtures. Asbestos Code A - Clear for repairs on 01/27/06. Tidewater - Carlos Vera (RG 01/27/06) January 26, 2006 October 4, 2006 251 days
FM-200514770 /05 10/4/06 Kramer Parking Lot and the Front of building Repair sunking holes October 28, 2005 October 4, 2006 341 days
FM-200619086 06 10/10/06 Basement, Girls' Restroom. Girls' restroom needs to rekeyed. February 24, 2006 October 10, 2006 228 days
FM-200619968 06 10/10/06 Asbestos Assessment Required. "Emergency" Second floor, Library and Room 207. Replace broken fire mesh glass in the side panels of doors. Asbestos Code A - Clear for repairs on 03/15/06. Tidewater - Samuel May (RG 05/05/06) March 15, 2006 October 10, 2006 209 days
FM-200618869 06 10/10/06 5 tons of sand and 5 tons pee gravle to do concrect work at schools in the d.c. public schools February 21, 2006 October 10, 2006 231 days
FM-200619085 06 10/10/06 Through-Out Entire Building. "Emergency" No power to clocks, outlets and boilers. February 24, 2006 October 10, 2006 228 days
FM-200621177 06 10/11/06 Second Floor-Rm. 207-Fire mesh glass broken-Door Asbestos Code A - Clear for repairs on 04/13/06. Tidewater - Shamika Parker (RG 04/18/06) April 11, 2006 October 11, 2006 183 days
FM-200621448 06 10/11/06 Basement - Panic bar needs to be changed, can not secure door properly. April 19, 2006 October 11, 2006 175 days
FM-200622759 06 10/12/06 Throughout the Building - Cafeteria Entrance door lock broken - Room 106 door lock broken - Room 201 door lock broken - Room 209 door lock broken - Room 304 door lock broken May 16, 2006 October 12, 2006 149 days
FM-200623866 06 10/12/06 Replace window a/c unit in classroom 304. Summer school site. June 5, 2006 October 12, 2006 129 days
FM-200623867 06 10/12/06 Replace window a/c unit in classroom 204. Summer school site. June 5, 2006 October 12, 2006 129 days
FM-200623868 06 10/12/06 Replace window a/c unit in classroom 206. Summer school site. June 5, 2006 October 12, 2006 129 days
FM-200623869 06 10/12/06 Replace window a/c unit in classroom 205. Summer school site. June 5, 2006 October 12, 2006 129 days
FM-200623870 06 10/12/06 Replace window a/c unit in classroom 105. Summer school site. June 5, 2006 October 12, 2006 129 days
FM-200628094 06 10/12/06 1st Floor- Room 103 Repair/replace window a/c unit. August 22, 2006 October 12, 2006 51 days
FM-200625623 06 10/12/06 Second floor, Room 204 & Third floor, Room 304. Install (2) a/c units ( 24000 BTU) for summer school. July 12, 2006 October 12, 2006 92 days
FM-200626887 06 10/12/06 3rd Floor- Room 304 Repair/replace window a/c unit. August 7, 2006 October 12, 2006 66 days
FM-200622312 06 10/12/06 Basement- Room 21 Re-key computer lab door. May 8, 2006 October 12, 2006 157 days
FM-200622637 06 10/12/06 Basement-Girl's Restroom: Unstop sinks May 15, 2006 October 12, 2006 150 days