Closed Repair Requests: November 2002
See Also: All Closed Repair Requests at Kramer Middle School
November 2002 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
5Average Time Elapsed: 55.2 Days - Total Requests
5
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200219732 /02 11/5/02 Kramer Boiler Room Replace 1" busted pipe in tunnel of Boiler room. Pipe is rusty and leaking. Asbestos Code A - Clear for repairs on 10/22/02. Horne Engineering - Troy Wilcom (RG 10/23/02) | |||
| FM-200206528 02 11/13/02 (Kramer) 1st floor/auditorium: Repair and/or replace a/c unit 20,000 BTU; Two are not working. (Health hazard) | |||
| FM-200220413 /02 11/14/02 Kramer Boiler Room Repair #3 Boiler keeps going off on flame failure, this is am emergency. | |||
| FM-200218875 02 11/15/02 Kramer Boiler Room Boiler #1,#2 and #3 will not start. Please check. | |||
| FM-200221553 /02 11/24/02 Kramer Boiler Room Boiler #2, has leaking tubes. |