Closed Repair Requests: November 2003
See Also: All Closed Repair Requests at Kramer Middle School
November 2003 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
3Average Time Elapsed: 32 Days - Total Requests
3
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200340349 /03 11/18/03 Kramer First Floor - Boys Bathroom 1) Ceiling Leaking. | |||
| FM-200340399 /03 11/20/03 Kramer M.S Entrance door ,boiler room office Cut (3) three keys for engineer ,engineer has key that is be cut. | |||
| FM-200335864 03 11/21/03 Kramer F-110.0 Fire Code Violation Basement Exit light at stairwell C. |
© The Washington Post Company
