Closed Repair Requests: December 2003

See Also: All Closed Repair Requests at Kramer Middle School

December 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 110 Days
  • Routine Requests
    9
    Average Time Elapsed: 62.4 Days
  • Total Requests
    11

Detailed Reports

Urgent Repair Requests Completed in December 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200335861 03 12/8/03 Kramer F-343.5 Fire Code Violation Third floor Room 311 safety glass missing. August 20, 2003 December 8, 2003 110 days
FM-200335863 03 12/8/03 Kramer F-110.0 Fire Code Violation Second floor Room 200 Library 311 safety glass. August 20, 2003 December 8, 2003 110 days

Routine Repair Requests Completed in December 2003 (9)
Description Open Date Close Date Time Elapsed
FM-200340822 /03 12/3/03 Kramer Middle School Boiler Room Install deadbolt or rim lock, on wooden boiler room door. November 28, 2003 December 3, 2003 5 days
FM-200340950 03 12/4/03 Kramer School Bulk trash pick-up December 2, 2003 December 4, 2003 2 days
FM-200335859 03 12/9/03 Kramer F-343.5 Fire Code Violation Third floor Room 304 defective door. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) August 20, 2003 December 9, 2003 111 days
FM-200335868 03 12/9/03 Kramer F-343.5 Fire Code Violation First floor Parent center room 105 door defective. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) August 20, 2003 December 9, 2003 111 days
FM-200335865 03 12/9/03 Kramer F-110.0 Fire Code Violation Basement Hallway at stairwell C door defective. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) August 20, 2003 December 9, 2003 111 days
FM-200335862 03 12/9/03 Kramer F-343.5 Fire Code Violation Third floor Stairwell door knob defective. Forward To Locksmith per Structural Maintenance. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) August 20, 2003 December 9, 2003 111 days
FM-200335860 03 12/9/03 Kramer F-343.5 Fire Code Violation Third floor Room 311 defective door. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) August 20, 2003 December 9, 2003 111 days
FM-200342097 /03 12/29/03 (Kramer) !!!AS SOON AS POSSIBLE!!! Rear Exit Door: Unable to enter building, lock vandalized, and broken key cylinder damaged. December 29, 2003 December 29, 2003 0 days
FM-200342071 /03 12/29/03 Kramer Boiler Room Domestic hot water heater leaking, from tank and union. December 29, 2003 December 29, 2003 0 days