Closed Repair Requests: February 2003

See Also: All Closed Repair Requests at Kramer Middle School

February 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 175.5 Days
  • Routine Requests
    6
    Average Time Elapsed: 98.7 Days
  • Total Requests
    8

Detailed Reports

Urgent Repair Requests Completed in February 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200205026 02 2/14/03 KRAMER Asbestos Assessment Required 2nd Floor Library Remove and replace the wooden floor tiles which has rotted out [safety hazard]. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 3/28/02 (CEB) March 28, 2002 February 14, 2003 323 days
FM-200225033 03 2/28/03 Kramer First floor - room 102 principal office Lights need repair. Urgent January 31, 2003 February 28, 2003 28 days

Routine Repair Requests Completed in February 2003 (6)
Description Open Date Close Date Time Elapsed
FM-200224427 03 2/3/03 Kramer First and third floor Room 101 needs to be rekeyed. Room 308 needs to be keyed. January 23, 2003 February 3, 2003 11 days
FM-200224614 03 2/3/03 Kramer room 319 Door lock hardware need to be replace or repair, vandalism. January 27, 2003 February 3, 2003 7 days
FM-200224030 03 2/12/03 Kramer Kitchen Sink is leaking water onto floor from pipe underneath. Please repair or replace. January 15, 2003 February 12, 2003 28 days
FM-200214845 02 2/14/03 Kramer F-303.4 Fire Code Violation 1st Floor Boys' Side Coach's Office Door not latching. Routed to Locksmith on 1/15/03 per Structural Maintenance. August 16, 2002 February 14, 2003 182 days
FM-200214818 02 2/14/03 Kramer F-303.4 Fire Code Violation 2nd Floor Stairwell B Door has missing latch. August 16, 2002 February 14, 2003 182 days
FM-200214813 02 2/14/03 Kramer F-303.4 Fire Code Violation 3rd Floor Room 315 Defective hardware. August 16, 2002 February 14, 2003 182 days