Closed Repair Requests: February 2004

See Also: All Closed Repair Requests at Kramer Middle School

February 2004 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    6
    Average Time Elapsed: 221 Days
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Completed in February 2004 (6)
Description Open Date Close Date Time Elapsed
FM-200442319 04 2/7/04 Kramer Boiler Room Boiler #2 need repair. January 7, 2004 February 7, 2004 31 days
FM-200443580 04 2/17/04 Kramer Boiler Room Boiler #3 out on flame failure. Boiler #2 need to be fixed before calibration 1 out of 3 Boilers working. February 2, 2004 February 17, 2004 15 days
FM-200340359 /03 2/18/04 Kramer M.S. Back Playground Reoair heat pump, motor master box # 32LH 90001 knock off. Carrier - Model #50TJOO7521 Volts-208-230 PH-3 HZ-60 7.5 Lbs. November 17, 2003 February 18, 2004 93 days
FM-200444220 04 2/20/04 parts to repair bob cat and trailler at krammer annex February 19, 2004 February 20, 2004 1 day
FM-200213970 02 2/23/04 Kramer 1. Asbestos Assessment Reqd. 1st Floor Gymnasium 2. Replace bleachers in auditorium [replacements on hand] and additional hardware [nuts, bolts, screws, etc.] may be needed. needed Asbestos Code A - Clear for reparis on 08/09/02. Horne Engineering - Sheryll James (RG 08/12/02) August 9, 2002 February 23, 2004 563 days
FM-200209252 02 2/23/04 Kramer 1. Asbestos Assessment Reqd. Basement Landing [Stairwell "B"] 2. Repair a 5-inch hole in the wall that is the result of vandalism. Code A - Clear for repairs on 06/10/02. Horne Engineering - Sheryll James (RG 06/10/02) June 10, 2002 February 23, 2004 623 days