Closed Repair Requests: February 2007
See Also: All Closed Repair Requests at Kramer Middle School
February 2007 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200511733 05 2/23/07 Kramer Back playground Repair heat pump, won't run carrier-model #50TJ007521 Volts 208-230 3 Phase 60 HZ 7.5 Lbs Service Room #21 Urgent !!!!! |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200333049 03 2/2/07 Kramer First flooy - gymnasium Ceiling light bulbs burned out. Bulbs need replacement. Cherry picker, a lifter or high ladder may be needed. | |||
| FM-200626769 06 2/5/07 Kramer Boiler Room Boiler room flooded check all electric controls on pumps and boilers | |||
| FM-200619704 06 2/5/07 taginator is neended to put back in stock | |||
| FM-200510793 05 2/5/07 Kramer Annex Rear Play-ground Repair heat pump, won't run- for room #21 fan locked. AO Smith HP-1/4 RPM - 1075 AMP - 1.3 HZ - 60 | |||
| FM-200503296 05 2/5/07 Kramer Boiler Room Boiler #1 off on alarm, no heat in Building. Only Boiler working. | |||
| FM-200631724 /2/06 2/5/07 KRAMER Boiler # 1 & 2 replace gas valve on boiler s 1 & 2 and fire eye 9n boiler # 2 | |||
| FM-200630774 /13/06 2/5/07 KRAMER BOILER room Attempt to test fire boiler # 3 will not start out on flame failure. | |||
| FM-200458994 04 2/5/07 Kramer Burner cilibration. | |||
| FM-200458944 04 2/5/07 Kramer Boiler Room Repair or replace return pumps in Boiler Room. | |||
| FM-200458302 /04 2/5/07 Kramer Boiler Room Repair or replace boiler solenoid valve for feed water tank. Automatic Switch Co. / Rebuilt Kit #302276 / Air, Inert Gas (PSI) 150 Water (PSI) 150 / Lt. Oil (PSI) / Serial # F673280 / Pipe 3/4" Valve Cat. #8210G95 Encl. Types 2,3,35.4X4K (1) Shut off valve Red Hot. | |||
| FM-200448714 04 2/5/07 Kramer Boiler Room Boiler #2 Burner needs to be calibrated. | |||
| FM-200501362 05 2/9/07 Kramer Third floor room 313 Univent need to be repaired, motor very loud, no heat in the room. | |||
| FM-200458555 /04 2/9/07 Kramer Boiler Room Repair or replace float valve on feedwater tank. Leaking and contacts are sticking. Per: Mr Temple | |||
| FM-200501363 05 2/22/07 Kramer First floor room 106 Univent need to be repaired, leaking water down to basement, no heat in the room. | |||
| FM-200509230 05 2/23/07 Kramer Boiler Room Replace low water cut off chamber on boiler #1 McDonnell & Miller - 150. |
© The Washington Post Company
