Closed Repair Requests: March 2003

See Also: All Closed Repair Requests at Kramer Middle School

March 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 298 Days
  • Routine Requests
    18
    Average Time Elapsed: 310.6 Days
  • Total Requests
    20

Detailed Reports

Urgent Repair Requests Completed in March 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200123746 /01 3/25/03 KRAMER BOILER ROOM 1.ASBESTOS ASSESSMENT REQUIRED 2.REPAIR LEAKING COLD WATER LINE IN MOTOR ROOM. 1 INCH LINE IS LEAKING. WATER IS LEAKING ON BOLIER ROOM FLOOR CODE A CLEAR FOR REPAIR BY HORNE ENG. TROY WILCOME 11-23-01. DCPS SAFETY S.R. HOWARD 11-23-01. November 23, 2001 March 25, 2003 487 days
FM-200222148 02 3/26/03 Kramer Room #212 Asbestos assessment required Repair /replace leaking coils in univent heater. Note: This is urgent, causing damage to ceiling and ceiling tile below it. Asbestos Code A - Clear for repairs on 12/09/02. Horne Engineering -Philp Connolly (RG 12/12/02) December 7, 2002 March 26, 2003 109 days

Routine Repair Requests Completed in March 2003 (18)
Description Open Date Close Date Time Elapsed
FM-200226058 03 3/5/03 Kramer Boiler Room Boiler #1 out on flame failure. February 24, 2003 March 5, 2003 9 days
FM-200214867 02 3/6/03 Kramer F-610.2 Fire Code Violation 3rd Floor Stairwell D Exit light is out by stairwell D. August 16, 2002 March 6, 2003 202 days
FM-200220613 /02 3/13/03 Kramer Boiler Romm Tunnel Repair or replace busted 3/4" steam supply line in tunnel. No insulation on pipes. Asbestos Code A - Clear for repairs on 12/12/02. Horne Engineering - Tony Marcolin (RG 12/13/02) November 12, 2002 March 13, 2003 121 days
FM-200100758 01 3/17/03 KRAMER BOILER ROOM REPAIR BURNER ON BOILER #1 DOWN ON MAIN FLAME FAILURE. ONLY (1) BOILER IS IN OPERATION. HC-20001081 January 10, 2001 March 17, 2003 796 days
FM-200102698 01 3/17/03 KRAMER BOILER ROOM KRAMER MS BOILER ROOM (1) ASBESTOS ASSESSMENT IS REQUIRED (2)TWO PIPES OVER HOT WATER TANK ARE LEAKING - ONE 1-1/2" AND ONE 2". DOMESTIC HOT WATER TANK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/06/01. HORNE ENGINEERING - SHERYLL GAMES (RG) February 1, 2001 March 17, 2003 774 days
FM-200219562 /02 3/19/03 Kramer School Repair/install bleachers October 17, 2002 March 19, 2003 153 days
FM-200218472 02 3/19/03 Kramer School Remove sign from school September 27, 2002 March 19, 2003 173 days
FM-200204489 02 3/19/03 Kramer Jr. High School Apply fertilizer and lime to filed March 15, 2002 March 19, 2003 369 days
FM-200124137 /01 3/20/03 KRAMER BOILER MAINTENANCE 1) BOILER WATER TREATMENT SERVICES TRICON OF WASHINGTON INC. POC: THOMAS PICKETT - 698-1750 November 30, 2001 March 20, 2003 475 days
FM-200100789 01 3/25/03 KRAMER BOILER ROOM SURVEY AND MAKE NECESSARY REPAIRS TO BOILER #1. BOILER WILL NOT LIGHT OFF. HC-20001062 January 10, 2001 March 25, 2003 804 days
FM-200125316 /01 3/25/03 (KRAMER) ASBESTOS ASSESSMENT REQUIRED. ACROSS FROM ROOMS 300 & 310 REPAIR OR REPLACE LEAKING RADIATOR IN WEST CORRIDOR BY ROOM 310; REPAIR OR REPLACE LEAKING RADIATOR IN EAST CORRIDOR BY ROOM 300. WATER LEAKING ON TO CORRIDOR. RADIATOR IS NOW VALVED OFF. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/2/02 BY HORNE ENGINEER: ROGER KAGER December 14, 2001 March 25, 2003 466 days
FM-200122493 /01 3/25/03 KRAMER ANNEX BOILER ROOM REPLACEMENT OF FOUR (4) BOILER FEEDWATER PUMPS. MARATHON MODEL #DM-0-101, PH 3 TYPE, VOLT 208 230/460, DUTY CONT.L, RPM 1735, HP-2. WP-200107422 October 26, 2001 March 25, 2003 515 days
FM-200220364 /02 3/26/03 Kramer Boiler Room Replace leaking tubes in Boiler #2 October 31, 2002 March 26, 2003 146 days
FM-200219728 /02 3/26/03 Kramer Boiler Room Repair/Replace city water make up tank float. Float is sticking,must hand feed water into Boilers. October 21, 2002 March 26, 2003 156 days
FM-200221593 /02 3/26/03 Kramer First Floor - #107 Repair busted univent coil in room #107, leaking down in kitchen ceiling. Turn off univent. November 25, 2002 March 26, 2003 121 days
FM-200222166 02 3/26/03 Kramer Boiler #2 and # 3 Boiler #2 and #3 flame failure. December 9, 2002 March 26, 2003 107 days
FM-200224936 03 3/26/03 Kramer Third Floor Hallway Repair/Replace leaking radiator on third floor,pin hole leak. January 30, 2003 March 26, 2003 55 days
FM-200220098 /02 3/26/03 Kramer Boiler Room 1-Asbestos assessment required 2-Replace 2" copper pipe on domestic hot water tank. (1) 2'X1" pipe; (2) 3" pipe, both pipes are corrsion and leaking. EMGERENCY!!!! October 28, 2002 March 26, 2003 149 days