Closed Repair Requests: March 2004

See Also: All Closed Repair Requests at Kramer Middle School

March 2004 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 11 Days
  • Routine Requests
    4
    Average Time Elapsed: 41 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in March 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200444895 04 3/16/04 Kramer !!!VERY URGENT!!! First floor girls restroom room 116 Sink fixtures need to be repaired or replaced. No hot water. Health hazard. 03/09/2004: Call came in today with a concern of having hot water too wash hands. March 5, 2004 March 16, 2004 11 days

Routine Repair Requests Completed in March 2004 (4)
Description Open Date Close Date Time Elapsed
FM-200442755 04 3/4/04 Kramer First floor parking lot Rear entrance gate damage inside entrance gate off track. 8th and Q fence damaged. January 14, 2004 March 4, 2004 50 days
FM-200340797 /03 3/15/04 Kramer Middle School Boiler Room Repair/Replace low water cut off and pump controls on all boilers. November 28, 2003 March 15, 2004 108 days
FM-200445914 04 3/29/04 Kramer Third floor restrooms Boys restroom 6th stall stopped up, commode snake neede. Firls restroom 6th stall control valve need to be fix or replaced. Water running. March 26, 2004 March 29, 2004 3 days
FM-200445907 04 3/29/04 Kramer Basement girls restroom Cut off valve needs to be repaired or replaced. March 26, 2004 March 29, 2004 3 days