Closed Repair Requests: March 2006
See Also: All Closed Repair Requests at Kramer Middle School
March 2006 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
3Average Time Elapsed: 159 Days - Total Requests
3
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200619334 06 3/17/06 Kramer Boiler Room Check and repair domestic hot water heater, heater is hamming badley. | |||
| FM-200510027 05 3/29/06 Kramer Jr. High Fire Code Violation 200 IFC 110.1.1 First Floor - Room 112 1) Fire stop breech in the wall. Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Henry Addison (RG 08/15/05) | |||
| FM-200509995 05 3/29/06 Kramer Jr. High Fire Code Violation 200 IFC 110.1.1 Basement Floor - Jamma Room G & F 1) Has a breech in the wall. Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Paul Berman (RG 08/15/05) |
© The Washington Post Company
