Closed Repair Requests: March 2006

See Also: All Closed Repair Requests at Kramer Middle School

March 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    3
    Average Time Elapsed: 159 Days
  • Total Requests
    3

Detailed Reports

Routine Repair Requests Completed in March 2006 (3)
Description Open Date Close Date Time Elapsed
FM-200619334 06 3/17/06 Kramer Boiler Room Check and repair domestic hot water heater, heater is hamming badley. March 2, 2006 March 17, 2006 15 days
FM-200510027 05 3/29/06 Kramer Jr. High Fire Code Violation 200 IFC 110.1.1 First Floor - Room 112 1) Fire stop breech in the wall. Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Henry Addison (RG 08/15/05) August 10, 2005 March 29, 2006 231 days
FM-200509995 05 3/29/06 Kramer Jr. High Fire Code Violation 200 IFC 110.1.1 Basement Floor - Jamma Room G & F 1) Has a breech in the wall. Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Paul Berman (RG 08/15/05) August 10, 2005 March 29, 2006 231 days

© The Washington Post Company