April 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 22.5 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in April 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200228436 03 4/8/03 (Kramer) 1st Floor/Room #101: Repair or replace pipping under sink, pipe is leaking profusely, and damaging the floor very badly. April 8, 2003 April 8, 2003 0 days
FM-200223746 03 4/8/03 Kramer Room #107 Replace hot water coil in room #107 13" X 41" January 13, 2003 April 8, 2003 85 days
FM-200228835 03 4/16/03 Kramer School Cut grass April 16, 2003 April 16, 2003 0 days
FM-200228665 03 4/16/03 Kramer Boiler room Repair # 1 burner , burner starts up and runs for two minutes then cuts off .can not build up any steam pressure, fire eye has been cleaned. #2 and #3 boiler down also. April 11, 2003 April 16, 2003 5 days