Closed Repair Requests: April 2006

See Also: All Closed Repair Requests at Kramer Middle School

April 2006 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 382.2 Days
  • Routine Requests
    43
    Average Time Elapsed: 972.6 Days
  • Total Requests
    47

Detailed Reports

Urgent Repair Requests Completed in April 2006 (4)
Description Open Date Close Date Time Elapsed
FM-200619100 06 4/3/06 Kramer Boiler Room Replace leaking feed water line to pressire gauge to feed water tank. Urgent !!!! February 26, 2006 April 3, 2006 36 days
FM-200617923 06 4/3/06 Kramer Girls Locker Room Radiator leaking supply line at 3/4" shut off valve. Urgent !!!!! January 26, 2006 April 3, 2006 67 days
FM-200209178 02 4/10/06 Kramer ****Urgent**** 2nd Floor Science Labs Need electrician to check electrical outlets in 3 science labs--- the window a/c units are not working and the classrooms are homerooms for students. [Check with Mr. Wilson for exact room numbers, there are four science labs.] June 7, 2002 April 10, 2006 1,403 days
FM-200620720 06 4/26/06 Kramer Stairwell- D- Between 1st and 2nd Floor Radiator leaking between seam. Urgent !!!!! April 3, 2006 April 26, 2006 23 days

Routine Repair Requests Completed in April 2006 (43)
Description Open Date Close Date Time Elapsed
FM-200619795 06 4/3/06 Kramer Tunnel Repair or replace 1-1/2" rupture pipe in South East part of tunnel. March 13, 2006 April 3, 2006 21 days
FM-200206496 02 4/10/06 Kramer Asbestos Assessment Reqd. 1st Floor Gym/Girl's Locker Room Repair or replace wall which has water damage. Code A-clear for repair by Horne Engineer by ( Bipin Nanavaty) on 4/26/02 ( CEB ) April 24, 2002 April 10, 2006 1,447 days
FM-200208826 02 4/10/06 Kramer 1. Asbestos Assessment Reqd. 1st Floor Gym/Girls' Locker Room 2. Repair or replace ceiling & wall that has sustained water damage. Asbestos Code A - Clear for repairs on 06/04/02. Horne Engineering - Donald Maglienti (RG) June 3, 2002 April 10, 2006 1,407 days
FM-200206768 02 4/10/06 Asbestos Assessment Reqd. Throughout the Building Electrical upgrade is needed in all corridors and stairwells, offices and classrooms: 2nd & 3rd floor landings & corridor is dark, near stairwell "C" Replace electronic ballast Corridor 3 tube fixtures Stairwell 2 tube fixtures Office & classroom needs 4 tube fixtures Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Sam Ebrahim (RG 05/02/02) April 29, 2002 April 10, 2006 1,442 days
FM-200206527 02 4/10/06 (Kramer) Through-out entire building: A/C units need service and/or replaced. April 24, 2002 April 10, 2006 1,447 days
FM-200221937 02 4/10/06 Kramer Outside grounds Three (3) lights out playground area, lights out front and 18th St. side. December 3, 2002 April 10, 2006 1,224 days
FM-200220898 /02 4/10/06 Kramer Basement - Cafeteria and teacher lounge Teacher lounge plaster on wall needs repair. Kitchen hall wall needs repairs, maybe water damage, plaster. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss on 11/15/02 DCPS Charles E. Buchanan November 13, 2002 April 10, 2006 1,244 days
FM-200220060 /02 4/10/06 Kramer Outside First floor Outside lights not working in front of building around to the 18th Street side of building. October 25, 2002 April 10, 2006 1,263 days
FM-200219731 /02 4/10/06 Kramer Boiler Room Check seals on vacuum pumps. Seals is leaking on vacuum pumps. October 21, 2002 April 10, 2006 1,267 days
FM-200219729 /02 4/10/06 Kramer Boiler Room Refurish condensate system. October 21, 2002 April 10, 2006 1,267 days
FM-200213977 02 4/10/06 Kramer 1st Floor Gymnasium/Girls' & Boys Showers Repair showers---there is no water in the fixtures and they may need parts replacement. August 9, 2002 April 10, 2006 1,340 days
FM-200457935 04 4/12/06 Kramer Basement,First,Second and Third - Thru-out 1) Drinking fountains need to be repaired or replace. Survey / Locations are attached to Service Order... November 4, 2004 April 12, 2006 524 days
FM-200335822 03 4/12/06 Kramer Throughout Drinking fountains need repair or replacing. Health hazard August 20, 2003 April 12, 2006 966 days
FM-200203605 02 4/14/06 (Kramer Middle School) Basement/Stairwell D Step has come apart, repair or replace as soon as possible. Step #8 coming up from the basement. February 27, 2002 April 14, 2006 1,507 days
FM-200336201 03 4/18/06 Kramer Boiler Room Boiler #3 burner need adjusting. Boilers failed inspection. Per D.C. Inspector August 25, 2003 April 18, 2006 967 days
FM-200336200 03 4/18/06 Kramer Boiler Room Boiler #2 and #3 replace 2 check valves and city water piping stop up. Boilers failed inspection. Per D.C. Inspector August 25, 2003 April 18, 2006 967 days
FM-200335890 03 4/18/06 Kramer Basement Windows need repairing cafeteria door and and stairwell corridor. August 20, 2003 April 18, 2006 972 days
FM-200334724 03 4/18/06 Kramer M.S Tunnel area in the boiler room Furnish two (2) Portable sump pumps to pump water out of the tunnels August 8, 2003 April 18, 2006 984 days
FM-200331446 03 4/18/06 Kramer Second Floor - Library 1. Broken fire mesh need to be replaced . ( 12 3/4 x 41 3/4 ) Asbestos Code A - Clear for repairs on 06/09/03. Horne Engineering - Edward Rodriguez (RG 06/09/03) June 9, 2003 April 18, 2006 1,044 days
FM-200330422 03 4/18/06 Kramer First floor room 108 Fire mesh door glass broken vandalism. Fire code violation May 20, 2003 April 18, 2006 1,064 days
FM-200228440 03 4/18/06 Kramer Basement - Kitchen Sink is leaking water onto floor from Pipes underneath. Please repair or replace. Trap may be needed. Health Hazard April 8, 2003 April 18, 2006 1,106 days
FM-200223857 03 4/18/06 (Kramer) !!!EMERGENCY!!! 1. Asbestos assessment required Basement/Classroom #21: Ceiling pipe ruptured. (Insullation on pipe) Asbestos Code C by Horne Engineer Philip Connolly on 01/15/03 Charles E. Buchanan January 13, 2003 April 18, 2006 1,191 days
FM-200223705 03 4/18/06 Kramer Boiler Room Check solenoid valve on b.w.f. tank. Water do not feed in tank. Electric going to valve.Boilers will not start up. Keep shutting off on flame failure. Note: Pearson work on valve, but need to come back January 10, 2003 April 18, 2006 1,194 days
FM-200223704 03 4/18/06 Kramer Boiler Room Check Boiler #2 and #3 solenoid gas valve, Boilers will not start up. Keep shutting off on flame failure. Note: Pearson work on Boilers, but did not finish the job. January 10, 2003 April 18, 2006 1,194 days
FM-200332778 03 4/18/06 Kramer Boiler Room Check motors on sump pump, bell keep ringing. July 1, 2003 April 18, 2006 1,022 days
FM-200618254 06 4/18/06 First floor, Rooms 101 & 103. "Emergency" Need electricians to assess and repair electrical problem. N ote: Power keeps shutting off. February 3, 2006 April 18, 2006 74 days
FM-200447837 04 4/18/06 Kramer Boiler Room Replace domestic hot water, A.O.Smith low pressure boiler Model #HW420932 Natural gas BTU/Hr. input 420,000 Output 344,400 Voltage 120 HZ 60 Max.WP water 160 PSI Heating surface 52.6 sq. ft. May 12, 2004 April 18, 2006 706 days
FM-200445713 04 4/18/06 Kramer Boiler Room Repair or replace automatic city maker up water valve , blow down is not cutting the boiler off on blow down March 23, 2004 April 18, 2006 756 days
FM-200445559 04 4/18/06 (Kramer) 1st Floor/Room #105: There is a very serious problem with clogged drains in this very long sink. Sewage is backing up through sink. March 18, 2004 April 18, 2006 761 days
FM-200443368 04 4/18/06 Kramer First floor room 106 Univent leaking at header. EMERGENCY Room is cold. January 29, 2004 April 18, 2006 810 days
FM-200443254 04 4/18/06 Kramer Room #106 Univent leaking at header, Room is cold. Emergency!!!!! January 27, 2004 April 18, 2006 812 days
FM-200442904 04 4/18/06 Kramer BoysRest Room, Gym Replace radiator, leaking at bottom. Radiator size 44" X 24" X 24 1/2" No other radiator in area. Emergency, restroom is cold. January 18, 2004 April 18, 2006 821 days
FM-200341579 /03 4/18/06 Kramer Boiler Room The float valve that controls the solenoid switch is leaking on the feed water tank. December 15, 2003 April 18, 2006 855 days
FM-200340633 /03 4/18/06 Kramer Boiler Room Furnish solenoid switch for feed water tank. November 21, 2003 April 18, 2006 879 days
FM-200340630 /03 4/18/06 Kramer Boiler Room Repair or replace Boiler Automatic water feeder. November 21, 2003 April 18, 2006 879 days
FM-200340536 /03 4/18/06 Kramer Basement rear exit door Exit sign has been vandalize. Please repair or replace. Fire cod voilation. November 20, 2003 April 18, 2006 880 days
FM-200340377 /03 4/18/06 (Kramer) Basement/Room #10: Repair hole in wall, top- 14" X 16" bottom,- 25" X 21 " April 27, 2004, Mr. Jackson is concerned as to when the repairs are to be made. Asbestos Code A - Clear for repairs on 11/18/03. Honre Engineering - Bipin Nanavaty (RG 11/19/03) November 17, 2003 April 18, 2006 883 days
FM-200339324 /03 4/18/06 Kramer M.S. Boiler room Repair # 1 burner will not start. # 2 and 3 down for calibrations (NO HEAT) October 23, 2003 April 18, 2006 908 days
FM-200339200 /03 4/18/06 (Kramer) !!EMERGENCY!! Basement/Room #21: Central air unit in the computer lab has been vandalized; control box is knock off, fan not working, and leaking. October 21, 2003 April 18, 2006 910 days
FM-200338862 /03 4/18/06 Kramer Basement cafeteria Ceiling is leaking water where the food is passed out. Please repair ASAP. October 14, 2003 April 18, 2006 917 days
FM-200338496 03 4/18/06 Kramer Boiler Room (Pit Motor) Repair or replace sump pump motor for Boiler Room, motor frozen up. October 4, 2003 April 18, 2006 927 days
FM-200337287 03 4/18/06 Kramer Boiler Room Boiler #2 needs chemical cleaning. September 11, 2003 April 18, 2006 950 days
FM-200620721 06 4/26/06 Kramer Boiler Room Replace 2" Black pipe leaking in tunnel B. Pipe size: 2" x 2' April 3, 2006 April 26, 2006 23 days