| FM-200619100 06 4/3/06 Kramer Boiler Room Replace leaking feed water line to pressire gauge to feed water tank. Urgent !!!! | |||
| FM-200617923 06 4/3/06 Kramer Girls Locker Room Radiator leaking supply line at 3/4" shut off valve. Urgent !!!!! | |||
| FM-200209178 02 4/10/06 Kramer ****Urgent**** 2nd Floor Science Labs Need electrician to check electrical outlets in 3 science labs--- the window a/c units are not working and the classrooms are homerooms for students. [Check with Mr. Wilson for exact room numbers, there are four science labs.] | |||
| FM-200620720 06 4/26/06 Kramer Stairwell- D- Between 1st and 2nd Floor Radiator leaking between seam. Urgent !!!!! |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200619795 06 4/3/06 Kramer Tunnel Repair or replace 1-1/2" rupture pipe in South East part of tunnel. | |||
| FM-200206496 02 4/10/06 Kramer Asbestos Assessment Reqd. 1st Floor Gym/Girl's Locker Room Repair or replace wall which has water damage. Code A-clear for repair by Horne Engineer by ( Bipin Nanavaty) on 4/26/02 ( CEB ) | |||
| FM-200208826 02 4/10/06 Kramer 1. Asbestos Assessment Reqd. 1st Floor Gym/Girls' Locker Room 2. Repair or replace ceiling & wall that has sustained water damage. Asbestos Code A - Clear for repairs on 06/04/02. Horne Engineering - Donald Maglienti (RG) | |||
| FM-200206768 02 4/10/06 Asbestos Assessment Reqd. Throughout the Building Electrical upgrade is needed in all corridors and stairwells, offices and classrooms: 2nd & 3rd floor landings & corridor is dark, near stairwell "C" Replace electronic ballast Corridor 3 tube fixtures Stairwell 2 tube fixtures Office & classroom needs 4 tube fixtures Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Sam Ebrahim (RG 05/02/02) | |||
| FM-200206527 02 4/10/06 (Kramer) Through-out entire building: A/C units need service and/or replaced. | |||
| FM-200221937 02 4/10/06 Kramer Outside grounds Three (3) lights out playground area, lights out front and 18th St. side. | |||
| FM-200220898 /02 4/10/06 Kramer Basement - Cafeteria and teacher lounge Teacher lounge plaster on wall needs repair. Kitchen hall wall needs repairs, maybe water damage, plaster. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss on 11/15/02 DCPS Charles E. Buchanan | |||
| FM-200220060 /02 4/10/06 Kramer Outside First floor Outside lights not working in front of building around to the 18th Street side of building. | |||
| FM-200219731 /02 4/10/06 Kramer Boiler Room Check seals on vacuum pumps. Seals is leaking on vacuum pumps. | |||
| FM-200219729 /02 4/10/06 Kramer Boiler Room Refurish condensate system. | |||
| FM-200213977 02 4/10/06 Kramer 1st Floor Gymnasium/Girls' & Boys Showers Repair showers---there is no water in the fixtures and they may need parts replacement. | |||
| FM-200457935 04 4/12/06 Kramer Basement,First,Second and Third - Thru-out 1) Drinking fountains need to be repaired or replace. Survey / Locations are attached to Service Order... | |||
| FM-200335822 03 4/12/06 Kramer Throughout Drinking fountains need repair or replacing. Health hazard | |||
| FM-200203605 02 4/14/06 (Kramer Middle School) Basement/Stairwell D Step has come apart, repair or replace as soon as possible. Step #8 coming up from the basement. | |||
| FM-200336201 03 4/18/06 Kramer Boiler Room Boiler #3 burner need adjusting. Boilers failed inspection. Per D.C. Inspector | |||
| FM-200336200 03 4/18/06 Kramer Boiler Room Boiler #2 and #3 replace 2 check valves and city water piping stop up. Boilers failed inspection. Per D.C. Inspector | |||
| FM-200335890 03 4/18/06 Kramer Basement Windows need repairing cafeteria door and and stairwell corridor. | |||
| FM-200334724 03 4/18/06 Kramer M.S Tunnel area in the boiler room Furnish two (2) Portable sump pumps to pump water out of the tunnels | |||
| FM-200331446 03 4/18/06 Kramer Second Floor - Library 1. Broken fire mesh need to be replaced . ( 12 3/4 x 41 3/4 ) Asbestos Code A - Clear for repairs on 06/09/03. Horne Engineering - Edward Rodriguez (RG 06/09/03) | |||
| FM-200330422 03 4/18/06 Kramer First floor room 108 Fire mesh door glass broken vandalism. Fire code violation | |||
| FM-200228440 03 4/18/06 Kramer Basement - Kitchen Sink is leaking water onto floor from Pipes underneath. Please repair or replace. Trap may be needed. Health Hazard | |||
| FM-200223857 03 4/18/06 (Kramer) !!!EMERGENCY!!! 1. Asbestos assessment required Basement/Classroom #21: Ceiling pipe ruptured. (Insullation on pipe) Asbestos Code C by Horne Engineer Philip Connolly on 01/15/03 Charles E. Buchanan | |||
| FM-200223705 03 4/18/06 Kramer Boiler Room Check solenoid valve on b.w.f. tank. Water do not feed in tank. Electric going to valve.Boilers will not start up. Keep shutting off on flame failure. Note: Pearson work on valve, but need to come back | |||
| FM-200223704 03 4/18/06 Kramer Boiler Room Check Boiler #2 and #3 solenoid gas valve, Boilers will not start up. Keep shutting off on flame failure. Note: Pearson work on Boilers, but did not finish the job. | |||
| FM-200332778 03 4/18/06 Kramer Boiler Room Check motors on sump pump, bell keep ringing. | |||
| FM-200618254 06 4/18/06 First floor, Rooms 101 & 103. "Emergency" Need electricians to assess and repair electrical problem. N ote: Power keeps shutting off. | |||
| FM-200447837 04 4/18/06 Kramer Boiler Room Replace domestic hot water, A.O.Smith low pressure boiler Model #HW420932 Natural gas BTU/Hr. input 420,000 Output 344,400 Voltage 120 HZ 60 Max.WP water 160 PSI Heating surface 52.6 sq. ft. | |||
| FM-200445713 04 4/18/06 Kramer Boiler Room Repair or replace automatic city maker up water valve , blow down is not cutting the boiler off on blow down | |||
| FM-200445559 04 4/18/06 (Kramer) 1st Floor/Room #105: There is a very serious problem with clogged drains in this very long sink. Sewage is backing up through sink. | |||
| FM-200443368 04 4/18/06 Kramer First floor room 106 Univent leaking at header. EMERGENCY Room is cold. | |||
| FM-200443254 04 4/18/06 Kramer Room #106 Univent leaking at header, Room is cold. Emergency!!!!! | |||
| FM-200442904 04 4/18/06 Kramer BoysRest Room, Gym Replace radiator, leaking at bottom. Radiator size 44" X 24" X 24 1/2" No other radiator in area. Emergency, restroom is cold. | |||
| FM-200341579 /03 4/18/06 Kramer Boiler Room The float valve that controls the solenoid switch is leaking on the feed water tank. | |||
| FM-200340633 /03 4/18/06 Kramer Boiler Room Furnish solenoid switch for feed water tank. | |||
| FM-200340630 /03 4/18/06 Kramer Boiler Room Repair or replace Boiler Automatic water feeder. | |||
| FM-200340536 /03 4/18/06 Kramer Basement rear exit door Exit sign has been vandalize. Please repair or replace. Fire cod voilation. | |||
| FM-200340377 /03 4/18/06 (Kramer) Basement/Room #10: Repair hole in wall, top- 14" X 16" bottom,- 25" X 21 " April 27, 2004, Mr. Jackson is concerned as to when the repairs are to be made. Asbestos Code A - Clear for repairs on 11/18/03. Honre Engineering - Bipin Nanavaty (RG 11/19/03) | |||
| FM-200339324 /03 4/18/06 Kramer M.S. Boiler room Repair # 1 burner will not start. # 2 and 3 down for calibrations (NO HEAT) | |||
| FM-200339200 /03 4/18/06 (Kramer) !!EMERGENCY!! Basement/Room #21: Central air unit in the computer lab has been vandalized; control box is knock off, fan not working, and leaking. | |||
| FM-200338862 /03 4/18/06 Kramer Basement cafeteria Ceiling is leaking water where the food is passed out. Please repair ASAP. | |||
| FM-200338496 03 4/18/06 Kramer Boiler Room (Pit Motor) Repair or replace sump pump motor for Boiler Room, motor frozen up. | |||
| FM-200337287 03 4/18/06 Kramer Boiler Room Boiler #2 needs chemical cleaning. | |||
| FM-200620721 06 4/26/06 Kramer Boiler Room Replace 2" Black pipe leaking in tunnel B. Pipe size: 2" x 2' |