Closed Repair Requests: May 2006

See Also: All Closed Repair Requests at Kramer Middle School

May 2006 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 285 Days
  • Routine Requests
    5
    Average Time Elapsed: 277.4 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in May 2006 (1)
Description Open Date Close Date Time Elapsed
FM-200510042 05 5/22/06 (Kramer) "Urgent" First floor/Girls' lockerroom. Asbestos Assessment Required. Girls' restroom in girls' lockerroom check for lead base walls & ceiling. Lead & Asbestos Code A - Clear for repairs on 08/10/05. Tidewater - Rodney Disyance/(RG 08/23/05) August 10, 2005 May 22, 2006 285 days

Routine Repair Requests Completed in May 2006 (5)
Description Open Date Close Date Time Elapsed
FM-200619738 06 5/4/06 "Emergency" Second floor, Boys' Restroom. Repair busted pipe by cut off valve this is located on last urinal on the end. March 10, 2006 May 4, 2006 55 days
FM-200510026 05 5/10/06 Kramer Jr. High Fire Code Violation 2003 DCMR 110.1.3 First Floor - Gym - Girls Locker Room Shower Area 1) Need lights, ceiling tile missing and peeling paint. Lead & Asbestos Code A - Clear for repairs on 08/10/05. Tidewater - Rodney Distance (RG 08/24/05) August 10, 2005 May 10, 2006 273 days
FM-200500047 05 5/10/06 Kramer Gym Replace blown lights. January 3, 2005 May 10, 2006 492 days
FM-200511364 05 5/22/06 (Kramer) "Emergency" Third floor, Boys' Restroom. Repair ceiling that fell over urinals. Asbestos Code A - Clear for repairs on 08/26/05. Tidewater - Rodney Distance (RG 09/01/05) August 25, 2005 May 22, 2006 270 days
FM-200509185 05 5/22/06 (Krammer) Cafeteria Area. Repair breach in wall. Asbestos Code A - Clear for repairs on 08/17/05. Tidewater - Samuel May (RG 08/18/05) July 29, 2005 May 22, 2006 297 days

© The Washington Post Company