Closed Repair Requests: June 2002

See Also: All Closed Repair Requests at Kramer Middle School

June 2002 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 26 Days
  • Routine Requests
    5
    Average Time Elapsed: 8.4 Days
  • Total Requests
    9

Detailed Reports

Urgent Repair Requests Completed in June 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200208115 02 6/3/02 Kramer ****Very Urgent**** 1. Asbestos Assessment Reqd. 2nd Floor Girls' Restroom 2. The wall, under the Bradley basin, is leaking water onto the floor and needs repair. The wall itself is very wet and the area of repair is where contractors installed the new Bradley basin. Code A- Asbestos abated on 05/22/02 PER Leroy Minton Jr. confirmation. (RG 05/23/02) May 21, 2002 June 3, 2002 13 days
FM-200207579 02 6/3/02 (Kramer) *Urgent* 1. Asbestos assessment required. 1st Floor/Stairwell -C: Hand rails have come completely away from wall (attached by one bolt). Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 05/14/02 May 10, 2002 June 3, 2002 24 days
FM-200208773 02 6/7/02 Kramer 1. Asbestos Assessment Reqd. 1st Floor Girls' Restroom 2. Drain pipe under sink needs to be repaired or replaced. [Safety hazard] Asbestos Code A - Clear for repairs on 06/03/02. Horne Engineering - Troy Wilcome (RG 06/04/02) June 3, 2002 June 7, 2002 4 days
FM-200206088 02 6/20/02 Kramer !!! Emergency !!! Second (2nd) Floor - Next to Boys Restroom 1. Asbestos Assessment Required. 2. Pipes leaking water thru the walls. Causing damage the walls. Safety Hazard. POC: Tyrone Hopson, Principal CAPE (IT Group)/703-461-6848 Code A - Asbestos abated on 04/19/02 PER Leroy Minton Jr. confirmation. (RG 04/26/02) April 18, 2002 June 20, 2002 63 days

Routine Repair Requests Completed in June 2002 (5)
Description Open Date Close Date Time Elapsed
FM-200208771 02 6/3/02 Kramer 1st Floor Room 111 The lock on the office door needs repair or replacement. June 3, 2002 June 3, 2002 0 days
FM-200208222 02 6/3/02 Kramer Basement/#25 Boys' Restroom Shut-off valve on urinal #4 does not work and needs repair or replacement. May 22, 2002 June 3, 2002 12 days
FM-200208772 02 6/7/02 Kramer Basement Toom #25 Boys' Restroom Cut-off valve on urinal #4 needs to be repaired or replace. June 3, 2002 June 7, 2002 4 days
FM-200209732 02 6/20/02 Kramer Basement Cafeteria The door lock needs repair or replacement---problem is the result of vandalism. June 18, 2002 June 20, 2002 2 days
FM-200208774 02 6/27/02 Kramer 1. Asbestos Assessment Reqd. Basement Wash Room #2 Shut-off valves on pipes need repair or replacement. Asbestos Code A - Clear for repairs on 06/03/02. Horne Engineering - Troy Wilcome (RG 06/05/02) June 3, 2002 June 27, 2002 24 days