Closed Repair Requests: June 2003

See Also: All Closed Repair Requests at Kramer Middle School

June 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 1 Day
  • Routine Requests
    3
    Average Time Elapsed: 44.3 Days
  • Total Requests
    4

Detailed Reports

Urgent Repair Requests Completed in June 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200331528 03 6/10/03 (Kramer) !!!VERY URGENT!!! Basement/Rear exit door: Panic bar locks as it is pushed, unable to return from that position. Students vandalized door by kicking it. June 9, 2003 June 10, 2003 1 day

Routine Repair Requests Completed in June 2003 (3)
Description Open Date Close Date Time Elapsed
FM-200331221 03 6/6/03 Kramer School Exterior Grounds 1. Cut and trim grass June 4, 2003 June 6, 2003 2 days
FM-200224939 03 6/10/03 Kramer Basement Room 21 Repair/Replace leaking 3/4'' black pipe in ceiling. January 30, 2003 June 10, 2003 131 days
FM-200331575 03 6/11/03 Kramer Throughout Cannot gain entrance to room doors with master key, please check and repair if needed. Basement 4, 8, 10, 21, 13 First 111, 113 & 118 June 11, 2003 June 11, 2003 0 days