Closed Repair Requests: June 2004

See Also: All Closed Repair Requests at Kramer Middle School

June 2004 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 0 Days
  • Routine Requests
    3
    Average Time Elapsed: 68.3 Days
  • Total Requests
    4

Detailed Reports

Urgent Repair Requests Completed in June 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200448940 04 6/4/04 (Kramer) !!!VERY URGENT!!! 1st Floor/Boys Locker Room: Water continues to run, sink control valve hanging off wall, and leaking. (Very large amount of water on the floor) June 4, 2004 June 4, 2004 0 days

Routine Repair Requests Completed in June 2004 (3)
Description Open Date Close Date Time Elapsed
FM-200340692 /03 6/2/04 (Kramer) Asbestos Assessment Required. 1st Floor/Room #115: Repair ceiling and wall, due to water leak. Asbestos Code A - Clear for repairs on 11/26/03. Horne Engineering - Troy WIilcome ( RG 12/01/03) November 24, 2003 June 2, 2004 191 days
FM-200448700 04 6/8/04 Kramer Boiler Room Boiler #3 need refractory on front door repaving. June 2, 2004 June 8, 2004 6 days
FM-200449205 04 6/18/04 Kramer First Floor - Boys Restroom - 115 1) Commode in 4th stall needs to be repaired. Water running from base. (Graduation is June 15, 2004) June 10, 2004 June 18, 2004 8 days