Closed Repair Requests: June 2004
See Also: All Closed Repair Requests at Kramer Middle School
June 2004 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200448940 04 6/4/04 (Kramer) !!!VERY URGENT!!! 1st Floor/Boys Locker Room: Water continues to run, sink control valve hanging off wall, and leaking. (Very large amount of water on the floor) |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200340692 /03 6/2/04 (Kramer) Asbestos Assessment Required. 1st Floor/Room #115: Repair ceiling and wall, due to water leak. Asbestos Code A - Clear for repairs on 11/26/03. Horne Engineering - Troy WIilcome ( RG 12/01/03) | |||
| FM-200448700 04 6/8/04 Kramer Boiler Room Boiler #3 need refractory on front door repaving. | |||
| FM-200449205 04 6/18/04 Kramer First Floor - Boys Restroom - 115 1) Commode in 4th stall needs to be repaired. Water running from base. (Graduation is June 15, 2004) |