Closed Repair Requests: July 2004

See Also: All Closed Repair Requests at Kramer Middle School

July 2004 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 31 Days
  • Routine Requests
    5
    Average Time Elapsed: 113.6 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in July 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200449856 04 7/29/04 (Kramer) !!!VERY URGENT!!! 3rd Floor/Restrooms: Snake needed to unstop commode in boys restroom. 3rd Floor/Girls Restroom: Repair or replace control valve, water running. June 28, 2004 July 29, 2004 31 days

Routine Repair Requests Completed in July 2004 (5)
Description Open Date Close Date Time Elapsed
FM-200449618 04 7/2/04 Kramer First floor playground / parking lot Fence has been damage on 18th and Fairlawn. Please repair or replace fence. June 22, 2004 July 2, 2004 10 days
FM-200443407 04 7/8/04 Kramer East Hallway Across from room #310 North Radiator fourth bootom fine leaking. Radiator size 24 1/2 X 44. *Two difference radiator on third floor. January 30, 2004 July 8, 2004 160 days
FM-200449855 04 7/19/04 (Kramer) 2nd Floor/Boys Restroom: Repair or replace fixtures on sink. June 28, 2004 July 19, 2004 21 days
FM-200337846 03 7/19/04 Kramer Basement kitchen Ceiling leaking water where the food is passed out. Please repair ASAP. Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Sheryll James (RG 09/25/03) September 23, 2003 July 19, 2004 300 days
FM-200447648 04 7/23/04 Kramer Second floor boys restroom Fixtures on sinks need to be repair or replaced. May 7, 2004 July 23, 2004 77 days