Closed Repair Requests: August 2002

See Also: All Closed Repair Requests at Kramer Middle School

August 2002 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 11.8 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in August 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200211150 02 8/16/02 Kramer Basement Kitchen Repair gas pipe and/or fittings. PEPCO went out and checked a gas leak from the stove and shut the gas off. July 12, 2002 August 16, 2002 35 days
FM-200214816 02 8/22/02 Kramer F-303.4 Fire Code Violation 2nd Floor Room 212 Door lock not working properly. August 16, 2002 August 22, 2002 6 days
FM-200214801 02 8/22/02 Kramer F-303.4 Fire Code Violation Basement Teachers' Lounge Door need turn-style lock. August 16, 2002 August 22, 2002 6 days
FM-200216088 02 8/29/02 Kramer Basement - Kitchen 1) Gas leak on wheel valve going to commercial range. Please repair or replace . Gas Company responded on 8/27/02. August 29, 2002 August 29, 2002 0 days

© The Washington Post Company