August 2005 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 126.2 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in August 2005 (4)
Description Open Date Close Date Time Elapsed
FM-200451729 04 8/22/05 Kramer Fire Code Violation Thru-out Electrical panel need signs. 2000 IFC 605.3.1 August 6, 2004 August 22, 2005 381 days
FM-200508206 05 8/30/05 Kramer Boiler Room Boiler #1need hydro test July 20, 2005 August 30, 2005 41 days
FM-200508204 05 8/30/05 Kramer Boiler Room Boiler #3 need chemical clean, for scale. July 20, 2005 August 30, 2005 41 days
FM-200508058 05 8/30/05 Kramer Boiler Room Boiler #1 replace (6) six tubes down and (5) five tubes across- leaking. July 19, 2005 August 30, 2005 42 days