Closed Repair Requests: August 2006

See Also: All Closed Repair Requests at Kramer Middle School

August 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    6
    Average Time Elapsed: 370.3 Days
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Completed in August 2006 (6)
Description Open Date Close Date Time Elapsed
FM-200626159 06 8/1/06 repair fence in front of biulding two poles and ten foot of fence July 24, 2006 August 1, 2006 8 days
FM-200625944 06 8/1/06 REPAIR OR REPLACE FENCE ON PLAYGROUND HOLDS HAVE BEN CUT IN FENCE. July 19, 2006 August 1, 2006 13 days
FM-200449904 04 8/1/06 Kramer First floor room 101 Security bars is needed on outside window. It appears that there was a breakin attemp. June 29, 2004 August 1, 2006 763 days
FM-200506072 05 8/11/06 Kramer Boiler Room Replace 3"x6' domestic hot water line leaking over hot water holding tank. May 27, 2005 August 11, 2006 441 days
FM-200342098 /03 8/25/06 Kramer West Hallway Across from room #309, north radiator fourth fin bottom leaking. Radiator size 44" X 24 1/2" December 29, 2003 August 25, 2006 970 days
FM-200626665 06 8/28/06 Rear Exit Door- Repair door; it is off of it's hinges. Note: The lock is on, and the door has been secured for the evening. August 1, 2006 August 28, 2006 27 days

© The Washington Post Company