Closed Repair Requests: September 2003

See Also: All Closed Repair Requests at Kramer Middle School

September 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 20.5 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in September 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200336976 03 9/8/03 Kramer !! Emergency !! First Floor 1. Lights out . September 8, 2003 September 8, 2003 0 days
FM-200337286 03 9/16/03 Kramer Third floor room 313 Bolt lock on classroom door need to be repaired and or replaced. Screw hole is strip. ASAP September 11, 2003 September 16, 2003 5 days
FM-200336338 03 9/24/03 Kramer Basement Commode 3rd stall need to be snaked out. Wash room sink needs to be snaked out. August 27, 2003 September 24, 2003 28 days
FM-200334583 03 9/24/03 Kramer Basement, first, second and third floor corridors Drinking fountains need to be repaired and/or replaced. No water pressure, some broken fixtures. Health hazard August 6, 2003 September 24, 2003 49 days